My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Addendum 3 Page 2 <br />CITY OF EVERETT 3200 Cedar Street Everett, WA 98201 (425) 257-8800 Fax (425) 257-8882 <br /> <br />“Any project related excavations within portions of the project area on West <br />Marine View Drive north of 22nd Street that will produce visible spoils and will <br />extend deeper than 20 feet below ground surface require archaeological <br />monitoring. Installation of sheet piling and piles are excluded from <br />archaeological monitoring as they will not produce visible spoils for <br />inspection.” <br />Item 3 - SECTION 01 50 00 TEMPORARY FACILITIES AND ENVIRONMENTAL <br />CONTROLS: <br />Replace Paragraph 1.2.K.2.d with the following: <br />“Wired coaxial or fiber connection to the field office with internet connectivity <br />supporting a minimum download speed of 500 Mbps and an upload speed of <br />at least 50 Mbps, including one (1) static IP address for remote support <br />access. If wired coaxial or fiber connection is not available, Starlink internet <br />service shall be provided as a temporary system until the above noted options <br />have been established.” <br />Item 4 - SECTION 01 57 13 TEMPORARY EROSION SEDIMENT CONTROL: <br />Delete Section 01 57 13 in its entirety and remove from Table of Contents. <br />Item 5 - SECTION 31 25 00 EROSION SEDIMENT CONTROL: <br />Replace Section 31 25 00 with updated version, attached. <br />Item 6 - SECTION 32 10 00 SURFACE RESTORATION: <br />Replace Section 32 10 00 with updated version, attached. <br />Item 7 - SECTION 33 05 31.11 PVC GRAVITY SEWER PIPE <br />Delete Paragraph 1.04.B.3. <br />Item 8 - SHEET C-2060: <br />Delete Water Keynote 26 and replace it with the following: <br />“APPROX STA 0+85: <br />CITY TO PROVIDE AND INSTALL INLINE VLAVE TO ISOLATE 16; W. <br />COORDINATE LOCATION AND OPERATION WITH CITY.” <br />See updated sheet, attached. <br />Item 9 - SHEET C-2501 through SHEET C-2506: <br />Replace Keynote 2 with the following: <br />“PROVIDE COMPOST SOCKS PER DETAIL 1/CD-2611.”
The URL can be used to link to this page
Your browser does not support the video tag.