My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Surface Restoration <br />Project No. 180162 32 10 00 - 1 <br /> <br />SECTION 32 10 00 <br />SURFACE RESTORATION <br />PART 1 GENERAL <br />1.01 DESCRIPTION <br />A. This Section specifies surface restoration. Provide all labor, equipment, materials, and <br />services required to replace existing surfaces and improvements removed, damaged, or <br />worn during performance of the Work. <br />B. Restoration shall include surfaces, all improvements, and maintaining or detouring traffic <br />including, but not limited to, utility covers and boxes, monuments, markers and striping, <br />signage, permanent pavement and surfacing and base and subgrade aggregate, <br />driveways, traffic control devices (e.g. loop detectors) and all ancillary components <br />removed or disturbed. Restoration of sidewalks; curbs; gutters; valley gutters shall be <br />incidental to the Work requiring removal and replacement. Surface restoration shall meet <br />the requirements of the government agency having jurisdiction (AHJ) of the right-of-way. <br />1. This Work shall consist of the reconstruction and patching of trenches and other <br />excavations in paved streets and other paved areas in accordance with COE Division <br />05. <br />2. Improvements shall be reconstructed to equal or better, in all respects, than the <br />existing improvements removed. <br />3. In the case of conflict between the listed Agency’s requirements and as required <br />herein, the requirements affording the greatest protection to the Public and/or Owner <br />shall apply, as determined by the Owner’s Representative. <br />C. Paving activities to conform with WSDOT 5-04.3(1) Weather Limitations. <br />D. All materials are subject to testing and prior approval. <br />1. Work within the Port property crosses and is adjacent to the Kimberly-Clark <br />Worldwide MTCA Site and the ExxonMobil/ADC MTCA site, which are listed on the <br />Washington State Department of Ecology’s (ECY) Confirmed and Suspected <br />Contaminated Sites List. <br />2. All import materials to be used for borrow, backfill and bedding are subject to the <br />Port requirements for testing, including contaminate and quality testing and <br />acceptance prior to delivery to the project site. Refer to City of Everett Special <br />Provision Section 3-01 for additional requirements. Chemical testing of all import <br />materials is required per Subparagraph 2.08. <br />E. Pipe construction, trenching and backfill plan submittal requirements are per Section 7- <br />08.3.
The URL can be used to link to this page
Your browser does not support the video tag.