My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/21/2026 (4)
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/21/2026 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2026 2:09:45 PM
Creation date
4/21/2026 2:04:08 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/21/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Addendums
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />PGSF WMVD Storm and Combined Sewer - Construction Package 2 Erosion and Sedimentation Control <br />Project No. 180162 31 25 00 - 20 <br /> <br />a. Remove TESC measures in accordance with the TESC Plan unless directed <br />otherwise by the Owner’s Representative. <br />3. Removal procedures shall ensure that trapped sediments are removed and disposed <br />of correctly. Trapped sediments shall not be released to the storm drainage system. <br />4. When removing silt fences and diversions, ensure trapped sediments are removed <br />along with the fence and diversion materials, or are stabilized, so that sediment will <br />not be eroded in the future and carried into the surface water drainage system. <br />5. Components of the TESC measures shall be the property of the Contractor. The <br />Contractor shall be responsible for transport and disposal in accordance with local, <br />state, and federal regulations. <br />B. Final Clean-up shall be performed in accordance with the requirements of Section 01 74 <br />23 – Final Cleaning. <br />3.07 SYSTEM COMPLIANCE <br />A. The Project Representative and regulatory agencies will determine the effectiveness of <br />the TESC Plan. <br />B. Upgrade and modify TESC Plan as required within five days of written Correction Notice <br />from the Project Representative until effective. Refusal to modify and upgrade the TESC <br />Plan may result in the work being completed by the Project Representative and the cost <br />of the work being deducted from the Application for Payment. <br />C. Non-compliance with the erosion control requirements and water quality requirements <br />may result in stoppage of work. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.