My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 29 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />Table 2. Required Ultimate Axial Pile Capacity – Proposed Pile-Supported Areas <br />Area - Structure <br />Pile Cap <br />Elevation <br />(feet)1 <br />Tip <br />Elevation <br />(feet)1,4 <br />Pile <br />Length <br />(feet) <br />Pile <br />Diameter <br />(inches)5 <br />Required <br />Ultimate Axial <br />Capacity <br />(kips) <br />Static Seismic <br />Area 10 – CS Vault <br />10-01 8 -25 33 8 902 55 <br />Area 15 – CS <br />Manhole 15-01 -3 -50 47 8 902 55 <br />Area 15 – CS <br />Manhole 20-01 -2 -22 20 8 902 55 <br />Area 20 – CS Debris <br />Removal 4 -20 24 8 902 55 <br />Area 20 – CS Debris <br />Removal Pipe <br />Support <br />-1 -22 21 8 902 55 <br />Area 30 - CS Vault <br />30-01 -5 -25 20 18 450 400 <br />Area 30 - Valve <br />Vault (Primary <br />Storage, P-30-17 and <br />18) <br />9 -30 39 18 450 400 <br />Area 40 – SW <br />Treatment System 8 -46 54 18 450 400 <br />Area 40 – SW <br />Treatment System 8 -62 70 18 450 400 <br />Area 40 – SW <br />Diversion Structure 9 -39 48 8 902 55 <br />Area 40 – SW <br />Diversion Structure <br />Pipelines <br />5 to -1 -39 38 to 34 18 300 250
The URL can be used to link to this page
Your browser does not support the video tag.