My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 30 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />Area - Structure <br />Pile Cap <br />Elevation <br />(feet)1 <br />Tip <br />Elevation <br />(feet)1,4 <br />Pile <br />Length <br />(feet) <br />Pile <br />Diameter <br />(inches)5 <br />Required <br />Ultimate Axial <br />Capacity <br />(kips) <br />Static Seismic <br />Area 40 – SWVT-40- <br />01 -1 -25 24 8 902 55 <br />Area 46 – CSMH 46- <br />01, CSMH 46-02, <br />pipe south of LS46 <br />(P-46-19), SWVT- <br />46-06 <br />1 to -6 -25 26 to 19 18 350 300 <br />Area 46 – CSVT-46- <br />04 and CSVT-46-05 8 -25 33 18 200 150 <br />Area 60 – Effluent <br />Pump Station3 12 -76 88 18 450 400 <br />Area 60 – Effluent <br />Pump Station -7 -76 69 18 600 550 <br />Area 60 – Effluent <br />Pump Station North <br />Pipe Tower <br />3 -76 79 18 450 400 <br />Area 60 – CSVT 60- <br />01 -1 -76 75 18 450 400 <br />Area 70 – First Floor <br />OMES Generator 14 -25 39 18 300 250 <br />Notes: <br />1 Pile cap and pile tip elevations are approximate. Final pile tip elevations shall be determined by the <br />contractor. <br />2 8-inch-diameter pile can typically achieve an ultimate pile capacity of 90 kips. A factor of safety of 2.0 <br />should be used for static conditions. <br />3 Contractor pile installation techniques and sequencing is unknown; therefore, HWA conservatively ignored <br />pile capacity contribution between approximate elevations 12 feet and -7 feet. <br />4 Pile tip elevation should be adjusted during construction based on the results of the pile testing program.
The URL can be used to link to this page
Your browser does not support the video tag.