My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 32 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />Area - Structure <br />Pile Cap <br />Elevation <br />(feet)1 <br />Tip <br />Elevation <br />(feet)1 <br />Pile <br />Length <br />(feet) <br />Pile <br />Diameter <br />(inches)3 <br />Down Drag <br />Loading <br />(kips)4 <br />Seismic <br />Area 20 – CS Debris <br />Removal Pipe Support -1 -22 21 8 5 <br />Area 30 - CS Vault 30-01 -5 -25 20 18 40 <br />Area 30 - Valve Vault <br />(Primary Storage, P-30-17 <br />and 18) <br />9 -30 39 18 30 <br />Area 40 – SW Treatment <br />System 8 -46 54 18 50 <br />Area 40 – SW Treatment <br />System 8 -62 70 18 50 <br />Area 40 – SW Diversion <br />Structure 9 -39 48 8 25 <br />Area 40 – SW Diversion <br />Structure Pipelines 5 to -1 -39 38 to 34 18 30 <br />Area 40 – SWVT-40-01 -1 -25 24 8 13 <br />Area 46 – CSMH-46-02 <br />01,CSMH 46-02, pipe <br />south of LS46 (P-46-19), <br />SWVT-46-06 <br />1 to -6 -25 26 to 19 18 10 <br />Area 46 – CSVT-46-04 <br />and CSVT-46-05 8 -25 33 18 10 <br />Area 60 – Effluent Pump <br />Station2 12 -76 88 18 190 <br />Area 60 – Effluent Pump <br />Station -7 -76 69 18 145 <br />Area 60 – Effluent Pump <br />Station North Pipe Tower 3 -76 79 18 210
The URL can be used to link to this page
Your browser does not support the video tag.