My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 31 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />5Pile diameter corresponds to pile type (e.g., piles shall be 8-inch-diameter micropiles or 18-inch-diameter <br />concrete-filled driven piles). <br />Provided the piles have a center-to-center spacing of at least 3D, where D is the diameter of the <br />piles, the pile group capacity can be taken as the sum of the individual pile capacities. If the <br />center-to-center pile spacing is less than 3D, the individual capacities should be reduced <br />accordingly. <br />4.6.2 Down Drag Loading on Vertical Piles <br />Down drag loading occurs when soil settlement relative to pile settlement is sufficient to <br />mobilize side friction in the downward direction (negative side resistance). Small relative <br />downward movements between the soil and the pile on the order of ¼ inch are sufficient to fully <br />mobilize negative shaft resistance or down drag. Hence, down drag loading must be considered <br />in design of the pile foundations due to the anticipated liquefaction-induced settlement. <br />Factors that directly contribute to the magnitude of the down drag loads experienced by each <br />deep foundation element include the elevation of the pile cap, thickness of the liquefiable soil <br />layer, the skin roughness based on pile type, and the pile diameter. HWA assumed residual shear <br />strengths of the liquified soil layer when considering down drag loading. A summary of down <br />drag loading for all proposed pile-supported areas and respective structures is presented in Table <br />3. <br />Table 3. Down Drag Loading – Proposed Pile-Supported Areas <br />Area - Structure <br />Pile Cap <br />Elevation <br />(feet)1 <br />Tip <br />Elevation <br />(feet)1 <br />Pile <br />Length <br />(feet) <br />Pile <br />Diameter <br />(inches)3 <br />Down Drag <br />Loading <br />(kips)4 <br />Seismic <br />Area 10 – CS Vault 10-01 8 -25 33 8 15 <br />Area 15 – CS Manhole 15- <br />01 -3 -50 47 8 20 <br />Area 15 – CS Manhole 20- <br />01 -2 -22 20 8 5 <br />Area 20 – CS Debris <br />Removal 4 -20 24 8 5
The URL can be used to link to this page
Your browser does not support the video tag.