Laserfiche WebLink
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 34 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />Table 4. Ultimate Uplift Pile Capacity – Proposed Pile-Supported Areas <br />Area - Structure <br />Pile Cap <br />Elevation <br />(feet)1 <br />Tip <br />Elevation <br />(feet)1 <br />Pile <br />Length <br />(feet) <br />Pile <br />Diameter <br />(inches)3 <br />Uplift Capacity <br />(kips) <br />Static Seismic <br />Area 10 – CS Vault <br />10-01 8 -25 33 8 25 12 <br />Area 15 – CS <br />Manhole 15-01 -3 -50 47 8 40 20 <br />Area 15 – CS <br />Manhole 20-01 -2 -22 20 8 40 20 <br />Area 20 – CS Debris <br />Removal 4 -20 24 8 25 12 <br />Area 20 – CS Debris <br />Removal Pipe <br />Support <br />-1 -22 21 8 25 12 <br />Area 30 - CS Vault <br />30-01 -5 -25 20 18 160 120 <br />Area 30 - Valve <br />Vault (Primary <br />Storage, P-30-17 and <br />18) <br />9 -30 39 18 170 90 <br />Area 40 – SW <br />Treatment System 8 -46 54 18 320 230 <br />Area 40 – SW <br />Treatment System 8 -62 70 18 690 600 <br />Area 40 – SW <br />Diversion Structure 9 -39 48 8 40 20 <br />Area 40 – SW <br />Diversion Structure <br />Pipelines <br />5 to -1 -39 38 to 34 18 240 175 <br />Area 40 – SWVT-40- <br />01 -1 -25 24 8 40 20