My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
January 3, 2025 <br />HWA Project No. 2021-159-21 <br />Geotechnical Engineering Report 35 HWA GEOSCIENCES INC. <br />Port Gardner Storage Facility <br />Area - Structure <br />Pile Cap <br />Elevation <br />(feet)1 <br />Tip <br />Elevation <br />(feet)1 <br />Pile <br />Length <br />(feet) <br />Pile <br />Diameter <br />(inches)3 <br />Uplift Capacity <br />(kips) <br />Static Seismic <br />Area 46 – CSMH-46- <br />02 01,CSMH 46-02, <br />pipe south of LS46 <br />(P-46-19), SWVT- <br />46-06 <br />1 to -6 -25 26 to 19 18 140 90 <br />Area 46 – CSVT-46- <br />04 and CSVT-46-05 8 -25 33 18 140 110 <br />Area 60 – Effluent <br />Pump Station2 12 -76 88 18 545 260 <br />Area 60 – Effluent <br />Pump Station -7 -76 69 18 500 260 <br />Area 60 – Effluent <br />Pump Station North <br />Pipe Tower <br />3 -76 79 18 535 260 <br />Area 60 – CSVT 60- <br />01 -1 -76 75 18 530 260 <br />Area 70 – First Floor <br />OMES Generator 14 -25 39 18 190 120 <br />Notes: <br />1 Pile cap and pile tip elevations are approximate. Final pile tip elevations shall be determined by the <br />contractor. <br />2 Contractor pile installation techniques and sequencing were not known at the time of this report; therefore, <br />HWA conservatively ignored pile capacity contribution between approximate elevations 12 feet and -7 feet. <br />3Pile diameter corresponds to pile type (e.g., piles shall be 8-inch-diameter micropiles or 18-inch-diameter <br />concrete-filled driven piles). <br /> <br /> <br />HWA recommends that the ultimate uplift capacity include a factor of safety of 2.0 for the static <br />loading condition and a factor of safety of at least 1.0 for the seismic loading condition. The <br />weight of the pile is not included in the uplift capacities presented in Table 4.
The URL can be used to link to this page
Your browser does not support the video tag.