My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
TYPICAL UTILITYTRENCH DETAILS2021-159-21ALP/SRBCF8FIGURE NO.:PROJECT NO.:DRAWN BY:CHECK BY:DBE/MWBEC:\USERS\CFRY\DESKTOP\2021-159-21 PORT GARDNER STORAGE FACILITY (LEP)\2021-159-21 PORT GARDNER STORAGE FACILITY (LEP).DWG <8> Plotted: 8/7/2024 1:49 PM8NOTES1.W=MAXIMUM WIDTH OF TRENCH. FOR PIPES 15" OR LESS IN DIA W=40".FOR PIPES 15" OF GREATER W=1.5XI.D.+18". PIPE MUST BE CENTERED INTRENCH.LEGENDLIGHT WEIGHT BACKFILL, SANDVERY SOFT FINE GRAINED SOILSCSBCGEOTEXTILE FABRICPERMEABLE BALLASTUTILITY TRENCH DETAILNTSVERY SOFTFINE GRAINEDSOILSLIGHT WEIGHT BACKFILL, SAND(ɣ = 100-110 pcf)PERMEABLE BALLASTCSBCTRACER/LOCATOR TAPEFINISHED SURFACEPER PLANSPORT GARDNER STORAGE FACILITYFACILITY CONSTRUCTIONPACKAGE WO#UP-3525EVERETT, WASHINGTONMATERIALS1.PIPE BEDDING MATERIAL SHALL BE CRUSHED SURFACING BASE COURSE(CSBC) CONFORMING TO SECTION 9-03.9(3) OF THE STANDARDSPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTIONWSDOT/APWA.2.OVER EXCAVATION AND PLACEMENT OF FOUNDATION MATERIAL, IFREQUIRED SHALL BE PERMEABLE BLAST, CONFORMING TO SECTION9-03.9(2) OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE ANDMUNICIPAL CONSTRUCTION WSDOT/APWA.GEOTEXTILE FABRIC FORSEPARATIONGEOTEXTILE FABRIC FORSEPARATION7
The URL can be used to link to this page
Your browser does not support the video tag.