My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction, LLC 4/22/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
KLB Construction, LLC 4/22/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:04:00 PM
Creation date
4/22/2026 11:17:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.1
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CF <br />LATERAL EARTH PRESSURES <br />FOR CANTILEVER TEMPORARY SHORING <br />TGC <br />8A <br />DRAWN BY: <br />PROJECT # <br />C:\USERS\CFRY\DESKTOP\2021-159-21 PORT GARDNER STORAGE FACILITY (LEP)\2021-159-21 PORT GARDNER STORAGE FACILITY (LEP).DWG <8A> Plotted: 11/26/2024 1:03 PM <br />CHECK BY: <br />FIGURE NO.: <br />DBE/MWBE <br />NOTES: <br />1.Ground water outside shoring assumed to be at elevation = 5 feet. <br /> DW = Ground surface elevation - ground water elevation. This assumes H > DW. <br />2.Design pressures are in units of psf; distances units of feet. <br />3.Surcharge load should include vehicular and construction equipment loads. <br />4.Embedment (D) should be determined by summation of moments below base of the excavation and to cut <br />off underground seepage to provide a stable bottom. <br />5.A factor of safety has not been applied to the recommended passive earth pressure values. <br />0.36Q <br />62.4(H) <br /> 23(H+D) <br /> 173D <br />2021-159-21 <br />PORT GARDNER STORAGE FACILITY <br />FACILITY CONSTRUCTION PACKAGE WO#UP-3525 <br />EVERETT, WASHINGTON
The URL can be used to link to this page
Your browser does not support the video tag.