ASPECT CONSULTING <br />56 FINAL PROJECT NO. AS190583A-08  MAY 21, 2025 <br />Work Plan (Landau, 2021b; 2021 IA Work Plan), which included a Soil and Groundwater <br />Management Plan to outline procedures for managing soil, groundwater, and stormwater <br />during implementation of the third IA, and Interim Action Work Plan Addendum No. 1 <br />(Landau, 2022a). The third IA consisted of site grading, cap construction, utility <br />installation, outfall reconstruction, soil and groundwater management, and security <br />fencing installation. <br />Site grading included importing, grading, and compacting clean fill to support <br />construction of the low-permeability cap, which was designed to reduce surface water <br />infiltration and prevent terrestrial ecological exposure to contaminated soil. The low- <br />permeability cap is constructed of 9 inches of asphalt pavement (Landau, 2024). During <br />the earthwork, subgrade utilities were installed to minimize future disturbance of the cap. <br />The IA included construction of a new stormwater drainage and conveyance system <br />integrated into the environmental cap, a new chitosan-enhanced sand filtration treatment <br />system for stormwater, and reconstruction of existing stormwater outfalls A and M for <br />discharge of the treated water to the East Waterway. The Site was previously fenced, but <br />the Port required that upgraded security fencing be installed to support the MIE project. <br />The third IA was successfully completed in May 2023. The construction report for the <br />third IA is included in Appendix A. <br />.