My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-2_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:55:34 PM
Creation date
4/22/2026 2:02:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.2
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ASPECT CONSULTING <br />56 FINAL PROJECT NO. AS190583A-08 MAY 21, 2025 <br />Work Plan (Landau, 2021b; 2021 IA Work Plan), which included a Soil and Groundwater <br />Management Plan to outline procedures for managing soil, groundwater, and stormwater <br />during implementation of the third IA, and Interim Action Work Plan Addendum No. 1 <br />(Landau, 2022a). The third IA consisted of site grading, cap construction, utility <br />installation, outfall reconstruction, soil and groundwater management, and security <br />fencing installation. <br />Site grading included importing, grading, and compacting clean fill to support <br />construction of the low-permeability cap, which was designed to reduce surface water <br />infiltration and prevent terrestrial ecological exposure to contaminated soil. The low- <br />permeability cap is constructed of 9 inches of asphalt pavement (Landau, 2024). During <br />the earthwork, subgrade utilities were installed to minimize future disturbance of the cap. <br />The IA included construction of a new stormwater drainage and conveyance system <br />integrated into the environmental cap, a new chitosan-enhanced sand filtration treatment <br />system for stormwater, and reconstruction of existing stormwater outfalls A and M for <br />discharge of the treated water to the East Waterway. The Site was previously fenced, but <br />the Port required that upgraded security fencing be installed to support the MIE project. <br />The third IA was successfully completed in May 2023. The construction report for the <br />third IA is included in Appendix A. <br />.
The URL can be used to link to this page
Your browser does not support the video tag.