Laserfiche WebLink
ASPECT CONSULTING <br />PROJECT NO. AS190583A-08  MAY 21, 2025 FINAL 57 <br /> <br />5 Preliminary Cleanup Levels (PCLs) <br />This section describes development of the numerical screening levels, also known as <br />preliminary cleanup levels (PCLs), developed in accordance with MTCA, which are used <br />for comparison with Upland Area soil, groundwater, and air data. The following <br />subsections describe the Upland Area land-use assumptions, the means by which human <br />or ecological receptors may be exposed to soil or groundwater contamination (exposure <br />pathways), and the resulting derivation of numerical PCLs and points of compliance for <br />use in the RI. <br />5.1 Current and Future Land and Water Uses <br />5.1.1 Land Use <br />Except as described in Section 5.1.1.2 for the Warehouse Subarea, the current and future <br />land use of the Upland Area meets MTCA criteria for an industrial property (WAC 173- <br />340-200 and -745(1)). The Upland Area is located within a long-term industrial area, and <br />it has historically been zoned Industrial, M-2 Heavy Manufacturing. In January 2013, after <br />the City completed its Central Waterfront Planning which included coordination with K-C, <br />the City reaffirmed the Upland Area’s industrial zoning, but with modifications as <br />discussed below. At that time, the City adopted a new land-use plan, the Central <br />Waterfront Redevelopment Plan (CWRP), as a Subarea Plan of the Everett <br />Comprehensive Plan. The CWRP imposes a modified M-2 zoning on the Central <br />Waterfront Planning Area, which includes the Upland Area property. The approved <br />alternative allows for water-dependent uses within the shoreline jurisdiction (i.e., <br />minimum of 200 feet from the Ordinary High Water Mark), and, outside of the shoreline <br />jurisdiction, a mix of water-dependent and non-water-dependent uses, both industrial and <br />nonindustrial. <br />As described in Section 2.1, the City owns the northernmost approximately 9 acres of the <br />Upland Area (Utility Property) for stormwater management purposes. The future land use <br />of the City Utility Property is described Section 5.1.1.1. The Port owns the remaining <br />approximately 46 acres that it has designated for maritime industrial use (Maritime <br />Industrial Expansion – Norton Terminal) under its Marine Terminal Master Plan except <br />for the existing Warehouse, which may be repurposed for commercial use, as discussed in <br />Section 5.1.1.2. The future land use of the Upland Area is depicted on Figure 5-1. <br />Consistent with these planned uses, the Upland Area excluding the Warehouse Subarea <br />meets the MTCA requirements for an industrial property designation in MTCA (WAC <br />173-340-745(1)(a)(i)): <br />(A) People do not live on the Upland Area property. The property is currently <br />unoccupied, and the primary future exposure will be to adults engaged in industrial <br />work activities on the property. <br />(B) Access to the Upland Area property by the general public is not allowed currently, <br />and it will be limited in the redeveloped condition. The City has preliminary plans to