Laserfiche WebLink
ASPECT CONSULTING <br />112 FINAL PROJECT NO. AS190583A-08  MAY 21, 2025 <br />Constituents that were not detected at concentrations greater than the PCLs in soil or <br />groundwater samples collected within Unit D include TPH-G, dioxins/furans, and VOCs, <br />metals, and SVOCs that are not included in the list above. <br />The sample locations for constituents detected at concentrations exceeding the PCLs in <br />Unit D are presented on Figures 6-D2 through 6-D10. The data for constituents detected at <br />concentrations exceeding the PCLs are summarized by constituent group in the following <br />subsections. <br />6.5.5.1 Total Petroleum Hydrocarbons and PAHs <br />During the first IA, four IA areas within Unit D focused on the removal of TPH- <br />contaminated soil: the Naval Reserve Parcel UST area, the Naval Reserve Parcel South <br />area, the CN-B-2 area, and the Hydraulic Barker Vault area (Figure 6-D1). During the <br />second IA, relatively high concentrations of cPAH left in-place in soil at the limits of the <br />CN-B-2 area excavation were removed from the CN West and CN East areas <br />(Figure 6-D1). Xylenes were the primary constituent targeted for IA in the UST 29/Latex <br />Spill area; however, TPH and cPAHs were also present in soil in this area at <br />concentrations exceeding the IA cleanup levels. The two IAs resulted in the removal of <br />approximately 10,700 tons TPH- and cPAH-contaminated soil and 5,440 tons xylene- <br />contaminated soil from the IA areas within Unit D (Figure 6-D1), as described by Aspect <br />(2015a; 2021). <br />Following the soil removals, the TPH PCLs are met in the Naval Reserve Parcel UST <br />area, the Naval Reserve Parcel South area, the CN-B-2 area, and the Hydraulic Barker <br />Vault area (Aspect, 2015a). In the Naval Reserve Parcel UST area and the CN-B-2/CN <br />west area, soil concentrations of total cPAHs (TMEQ) meet the soil PCLs except for three <br />samples in the saturated zone (Figure 6-D3). Following the first IA, four quarterly rounds <br />of postexcavation confirmation groundwater monitoring at these four areas demonstrated <br />that groundwater meets PCLs for TPH and PAHs, demonstrating the soil quality is <br />protective of groundwater, and Ecology agreed that no further groundwater monitoring for <br />those compounds was required for those areas (Aspect, 2015d). <br />The PCL for xylenes were met in the UST 29/Latex Spill area except for two bottom <br />samples, where the reported concentrations of total xylenes exceed the 0.23 mg/kg PCL <br />based on soil leaching (Table 6-13; Figure 6-D4). Four quarterly rounds of postexcavation <br />groundwater monitoring at the UST 29/Latex Spill area demonstrated that groundwater <br />meets PCLs for TPH, xylenes, and ethylbenzene (Table 6-14). The confirmation <br />groundwater data indicate that the residual soil xylenes concentrations are protective of <br />groundwater in accordance with MTCA. However, low-level total cPAHs (TEQ) <br />exceedances (up to 0.05 µg/L) have been reported in six of eight groundwater samples <br />collected from well UST29-MW-101 (Figure 6-D3). West of well UST29-MW-101, no <br />cPAH (TEQ) exceedances were detected in groundwater at shoreline monitoring wells <br />REC6-MW-02 (within Unit C) or TM-MW-06 (Figure 6-S1). The combined removal of <br />highly contaminated soil plus dewatering of the excavation throughout soil removal <br />successfully remediated the high xylene concentrations in groundwater present at the <br />UST29 location prior to the first IA.