Laserfiche WebLink
ASPECT CONSULTING <br />22 FINAL PROJECT NO. AS190583A-08  MAY 21, 2025 <br />As a result of these combined conditions, no surface runoff was observed leaving the <br />Upland Area property from the time that demolition activities concluded in 2013 until <br />2023. Upon completion of the third IA in mid-2023, the new storm drainage system <br />manages surface runoff. <br /> <br />