Laserfiche WebLink
<br /> 4 3/1/2021 <br /> <br />Below is a summary of the abandonment information for each location, listed by manhole <br />number (per Figure 1). <br />Manhole No. 1 <br />Manhole No. 1 has a 10-inch pipe entering and exiting the structure. The structure is 5-feet <br />deep and 4-feet in dimeter. The pipe distance filled with CDF was 50 inches in both directions. <br />The estimated total CDF volume that filled the pipes and the manhole was three cubic yards. <br />Manhole No. 2 <br />This manhole has a 10-inch pipe entering and a 16-inch pipe exiting the structure. The structure <br />is 6-feet deep and 4-feet in diameter. The pipe length filled was 50 inches on the inlet pipe and <br />80 inches on the outlet pipe. Approximately five cubic yards of CDF filled the pipes and <br />manhole. <br />Manhole No. 3 <br />This manhole has a 16-inch pipe entering and a 16-inch pipe exiting the structure. The structure <br />is 6-feet deep and 4-feet in diameter. The pipe length filled was 80 inches on both the inlet and <br />outlet pipes. About six cubic yards of CDF filled the pipes and manhole. <br />Manhole No. 4 <br />This manhole has a 16-inch pipe entering and a 16-inch pipe exiting the structure. The structure <br />is 6-feet deep and 4-feet in diameter. The pipe length filled was 80 inches on both the inlet and <br />outlet pipes. An estimated six cubic yards of CDF filled the pipes and manhole. <br />Manhole No. 5 <br />This manhole has a 16-inch pipe entering and an 18-inch pipe exiting the structure. The <br />structure is 8.5 feet deep and 4.5 feet in diameter. The pipe length filled was 80 inches on the <br />inlet pipe and 90 inches on the outlet pipe. An estimated nine cubic yards of CDF filled the pipes <br />and manhole. <br />Manhole No. 6 <br />This manhole has an 18-inch pipe entering and an 18-inch pipe exiting the structure. The <br />structure is 9-feet deep and 4.5 feet in diameter. The pipe length filled was 90 inches on the <br />inlet pipe and 90 inches on the outlet pipe. Just over nine cubic yards of CDF filled the pipes and <br />manhole. <br />