3815_PGSF WMVD Pkg 2_Vol 4-3_03.03.2026_BXWA_Certified
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
3815_PGSF WMVD Pkg 2_Vol 4-3_03.03.2026_BXWA_Certified
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 3:50:03 PM
Creation date
4/22/2026 3:00:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction, LLC
Approval Date
4/22/2026
Council Approval Date
4/8/2026
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
PGSF West Marine View Drive Storm and Combined Sewer, Package 2 Volume 4.3
Public Works WO Number
UP3815-02
Tracking Number
0005222
Total Compensation
$0.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1716
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> 5 3/1/2021 <br /> <br />Manhole No. 7 <br />This manhole has an 18-inch pipe entering and an 18-inch pipe exiting the structure. The <br />structure is 13.5 feet deep and 4.5 feet in diameter. The pipe length filled was 90 inches on the <br />inlet pipe and 90 inches on the outlet pipe. An estimated 12 cubic yards of CDF filled the pipes <br />and manhole. <br />Manhole No. 8 <br />This manhole has an 18-inch pipe entering and a 30-inch pipe exiting the structure. The <br />structure is 14-feet deep and 6-feet in diameter. The pipe length filled was 90 inches on the <br />inlet pipe and 150 inches on the outlet pipe. An estimated 20 cubic yards of CDF filled the pipes <br />and manhole. <br />Manhole No. 9 – (or Vault) <br />This structure is a vault rather than a manhole. The structure has a 30-inch pipe entering and a <br />30-inch pipe exiting the structure. The vault was smaller than expected. The pipe length filled <br />was 90 inches on the inlet pipe and the outlet pipe. Both the inlet and outlet pipe were capped <br />at the structure to allow complete filling and blocked to prevent water from entering or exiting. <br />The total volume of CDF to abandon this vault and piping was approximately 20 cubic yards. <br />End of Pipe for PS 04 <br />The pipe west of Manhole No. 9 is attached underneath the wharf and is a 30-inch diameter <br />clay-tile pipe. City crews planned to plug the accessible end of pipe with a mechanical plug <br />during low tides in July 2020. Due to the cleanup effort going on during the summer of 2020, <br />city forces could not access the wharf area to install the plug . This work is now being <br />coordinated with the Port of Everett and installation of the mechanical plug is now scheduled <br />during a low tide cycle the last week of March 2021. <br />Once the mechanical plug is installed photos will be emailed to Ecology. <br /> <br /> <br /> <br /> <br /> <br />