Laserfiche WebLink
3rd Interim Action Construction Report <br />Kimberly-Clark Upland Site <br /> 0121049.080.084 <br />July 30, 2024 7-1 landauinc.com <br />7.0 REFERENCES <br />Ecology. 2021. Second Amendment to Agreed Order No. DE 9476 In the Matter of Remedial Action by <br />Kimberly-Clark Worldwide, Inc and the Port of Everett. Washington State Department of Ecology. <br />May 18. <br />Landau. 2021. Final Interim Action Work Plan, Kimberly-Clark Worldwide Site Upland Area, 3rd Interim <br />Action, Port of Everett, Everett, Washington. Landau Associates, Inc. August 5. <br />Landau. 2022. Technical Memorandum: Interim Action Work Plan Addendum No. 1, Construction Phase <br />2—Low-Permeability Cap Expansion, Kimberly-Clark Worldwide Site Upland Area, Everett, <br />Washington. Landau Associates, Inc. July 20.