Laserfiche WebLink
3rd Interim Action Construction Report <br />Kimberly-Clark Upland Site <br /> 0121049.080.084 <br />July 30, 2024 6-1 landauinc.com <br />6.0 USE OF THIS REPORT <br />This report has been prepared for the exclusive use of the Port of Everett. Reliance on this report by <br />third parties is at their sole risk. Further, the reuse of information, conclusions, and recommendations <br />provided herein for extensions of the project or for any other project, without review and authorization <br />by Landau, shall be at the user’s sole risk. Landau warrants that within the limitations of scope, <br />schedule, and budget, our services have been provided in a manner consistent with that level of care <br />and skill ordinarily exercised by members of the profession currently practicing in the same locality <br />under similar conditions as this project. We make no other warranty, either express or implied.