2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 90 March 5, 2026 <br />1 other temporary longitudinal line shall be installed by striping truck based on Contractor <br />2 layout. Push carts or hand application is not allowed for longitudinal line. Temporary stop <br />3 lines and arrows shall be installed to their original location. Parking lines and bike lane <br />4 lines do not need to be installed as temporary pavement markings but may require layout <br />5 by the Contractor to determine pavement seams. <br />6 <br />7 All temporary pavement markings on the wearing course shall be installed in tape with the <br />8 dimensions described in 8-23.3(4)A Temporary Pavement Markings-Short Duration. <br />9 Temporary pavement marking tape for temporary center line, edge line, lane line, and <br />10 other temporary longitudinal line shall be installed by hand application based on <br />11 Contracting Agency layout. Temporary longitudinal lines shall be offset at least 6 inches <br />12 from the intended permanent markings provided by the Contracting Agency. Temporary <br />13 tape stop lines and arrows shall be installed at locations to their original configuration. <br />14 Tape stop lines can be installed with a perimeter marking 24 inches wide or single 8 inch <br />15 wide line. Tape arrows can be installed with a single 4 inch tape or perimeter in an arrow <br />16 shape the length of the original arrow. Crosswalks shall be two transverse and unbroken <br />17 8 inch wide tape lines. Parking lines and bike lane lines are not required and do not need <br />18 to be installed as temporary pavement markings. <br />19 <br />20 8-23.5 Payment <br />21 <br />22 Section 8-23.5 is supplemented with the following: <br />23 <br />24 (******) <br />25 Temporary Pavement Markings, per linear foot. <br />26 Temporary Pavement Markings per linear foot shall be full pay for constructing, <br />27 maintaining, and removing temporary lines and markers as specified. No additional <br />28 compensation will be allowed when Contractor is required to repair temporary <br />29 markings that have been damaged or worn. <br />30 <br />31 <br />32 <br />33 GKK 8-26.docx <br />34 8-26 RESOLVE ABOVE GROUND CONFLICTS <br />35 (******) <br />36 <br />37 Section 8-26 is vacant and is replaced with the following: <br />38 <br />39 8-26.1 Description <br />40 <br />41 This work consists of resolving unanticipated above ground conflicts to conform to the <br />42 Project requirements due to construction, where they are not addressed by the <br />43 Construction Plans and Details. This bid item may be used to construct or modify items <br />44 which are not identified, nor addressed in the Plans and Details. <br />45 <br />46 8-26.2 Vacant <br />47 <br />48 8-26.3 Construction Requirements <br />49