My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 89 March 5, 2026 <br />1 Payment <br />2 <br />3 All costs associated with layout of temporary striping shall be included in the <br />4 associated bid items for pavement marking and shall be full pay for all labor, <br />5 equipment, materials, and supervision utilized to perform the Work specified for <br />6 layout and preliminary spotting of pavement markings, including any resurveying, <br />7 checking, correction of errors, replacement of missing or damaged markings, and <br />8 coordination efforts. <br />9 <br />10 8-22.3(2) Preparation of Roadway Surfaces <br />11 <br />12 Section 8-22.3(2) is supplemented with the following: <br />13 <br />14 (******) <br />15 Apply materials to new HMA that is sufficiently cured according to the manufacturers <br />16 recommendation. Permanent paint marking material applied to new HMA require a <br />17 pavement cure period of at least 21 days. Permanent Type D marking material <br />18 applied to new HMA require a pavement cure period of at least 14 days. <br />19 <br />20 8-22.5 Payment <br />21 <br />22 Section 8-22.5 is supplemented with the following: <br />23 <br />24 (******) <br />25 24-inch Plastic Crosswalk Line, per square foot. <br />26 24-inch Plastic Stop Bar, per linear foot. <br />27 Plastic Sharrow, per each. <br />28 <br />29 8-23 TEMPORARY PAVEMENT MARKINGS <br />30 <br />31 8-23.2 Materials <br />32 <br />33 Section 8-23.2 is supplemented with the following: <br />34 <br />35 (******) <br />36 All temporary pavement markings on the ground surface shall be temporary marking paint. <br />37 All temporary pavement markings on the wearing course shall be temporary pavement <br />38 marking tape. <br />39 <br />40 8-23.3 Construction Requirements <br />41 <br />42 Section 8-23.3 is supplemented with the following: <br />43 <br />44 (******) <br />45 All temporary pavement markings on the ground surface shall be installed in paint with the <br />46 dimensions described in 8-23.3(4)B Temporary Pavement Markings-Long Duration. <br />47 Temporary pavement marking paint for temporary center line, edge line, lane line, and
The URL can be used to link to this page
Your browser does not support the video tag.