Laserfiche WebLink
CITY OF EVERETT, WASHINGTON <br />CONTRACT PROVISIONS FOR <br />WORK ORDER NO.: PW 3860 <br />2026 Pavement Maintenance Overlay Instructions to Bidders <br />PW# 3860 March 5, 2026 <br />3.Local Agency Subcontractor List (DOT Form 271-015 Revised 06/2025): To be filled in by the <br />Bidder. Bidder should note that license numbers are required on the form for heating, <br />ventilation and air conditioning, plumbing, and electrical work. <br />4.RCW 35.22.650 Certification: To be filled in and signed by the bidder. <br />5.Non-Collusion Declaration: To be submitted with the bid. <br />6.Bid Bond: This form provided by the City is to be executed by the Bidder and the surety <br />company unless bid is accompanied by a certified check or cashiers check. The amount of <br />this bond shall be not less than five percent (5%) of the total amount bid and may be shown <br />in dollars or on a percentage basis. Cash will not be accepted. <br />7.Proposal For Incorporating Recycled Materials Into The Project: To be filled in and signed by <br />the bidder. <br />Failure to complete the aforementioned forms and to submit the forms with the bid as required may <br />be due cause for rejection of bid. <br />All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal Code, Bid <br />Protest Procedures. <br />4.0 Pre-Award Form: Certification of Compliance with Wage Payment Statutes <br />The following form is required to be signed and submitted prior to award of Contract: <br />1.Certification of Compliance with Wage Payment Statutes: To be filled in and signed. This <br />certification is not required to be submitted with the bid proposal and may be submitted after <br />bid opening. The Contract cannot be awarded without this certification.