Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 8 March 5, 2026 <br />1 2. The Contracting Agency receives the request before the time set for receipt of <br />2 Bid Proposals, and <br />3 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting <br />4 Agency before the time set for receipt of Bid Proposals. <br />5 <br />6 If the Bidders request to withdraw, revise, or supplement its Bid Proposal is received <br />7 before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br />8 unopened Proposal package to the Bidder. The Bidder must then submit the revised or <br />9 supplemented package in its entirety. If the Bidder does not submit a revised or <br />10 supplemented package before the time set for receipt of Bid Proposals, then its bid shall <br />11 be considered withdrawn. <br />12 <br />13 Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br />14 recorded by the Contracting Agency and returned unopened. Requests to withdraw, <br />15 revise, or supplement a Bid Proposal may be submitted by the following methods: <br />16 <br />17 1. In person <br />18 *** at the location that the Contracting Agency accepts Bid Proposals, as stated in the <br />19 Notice to Contractors. ***. <br />20 <br />21 1-02.13.RTF <br />22 1-02.13 Irregular Proposals <br />23 (November 21, 2025 APWA GSP) <br />24 <br />25 Delete this section and replace it with the following: <br />26 <br />27 1. A Proposal will be considered irregular and will be rejected if: <br />28 a. The Bidder is not prequalified when so required; <br />29 b. The Bidder adds provisions reserving the right to reject or accept the Award, <br />30 or enter into the Contract; <br />31 c. A price per unit cannot be determined from the Bid Proposal; <br />32 d. The Proposal form is not properly executed; <br />33 e. The Bidder fails to submit or properly complete a subcontractor list as required <br />34 in Section 1-02.6; <br />35 f. The Bidder fails to submit the Bidder Questionnaire, if applicable, as required <br />36 by Section 1-02.6, or if the documentation that is submitted fails to meet the <br />37 requirements of the Special Provisions; or <br />38 g. The Bid Proposal does not constitute a definite and unqualified offer to meet <br />39 the material terms of the Bid invitation. <br />40 <br />41 2. A Proposal may be considered irregular and may be rejected if: <br />42 a. The Proposal does not include a unit price for every Bid item; <br />43 b. Any of the unit prices are excessively unbalanced (either above or below the <br />44 amount of a reasonable Bid) to the potential detriment of the Contracting <br />45 Agency; <br />46 c. The authorized Proposal Form furnished by the Contracting Agency is not <br />47 used or is altered; <br />48 d. The completed Proposal form contains unauthorized additions, deletions, <br />49 alternate Bids, or conditions; <br />50 e. Receipt of Addenda is not acknowledged;