Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 17 March 5, 2026 <br />1 <br />2 The Contractor shall perform the following measures to minimize construction noise: <br />3 <br />4 1. All trucks performing export haul shall have well maintained bed liners as <br />5 inspected and accepted by the Engineer. <br />6 <br />7 2. Truck tailgate banging is prohibited. All truck tailgates shall be secured to prevent <br />8 excessive noise from banging. <br />9 <br />10 3. A copy of the noise exemption and/or variance shall be kept on the project site <br />11 at all times. <br />12 <br />13 *** <br />14 4. Any back-up alarms shall be directional broad band type alarms. <br />15 <br />16 5. All other conditions of the City of Everett Noise Variance for 2026 Pavement <br />17 Maintenance Overlay WO3860 dated February 26, 2026 shall be adhered to. <br />18 See appendix for copy of the Noise Variance. <br />19 <br />20 6. The Contracting Agency will provide the Nighttime Work Mail Notification, and <br />21 the Contractor shall submit the following information to the Contracting Agency <br />22 20 working days prior to the start of nighttime Work: <br />23 <br />24 a. Start date and duration of the nighttime Work. <br />25 b. List of the expected nighttime noise sources. <br />26 c. List of noise mitigation measures to be implemented. <br />27 *** <br />28 <br />29 General <br />30 Failure of the Contractor to perform all obligations under this Special Provision will result <br />31 in the suspension of all night Work until a corrective Work plan is accepted by the Engineer. <br />32 Working days will continue to accrue during the period of suspension. <br />33 <br />34 The Contractor shall be responsible for obtaining all exemptions or variances to perform <br />35 nighttime Work outside the project limits such as staging areas. A copy of each exemption <br />36 or variance obtained by the Contractor shall be provided to the Contracting Agency before <br />37 proceeding with the nighttime Work. <br />38 <br />39 Other noise mitigation measures may be required, and it is understood that the Contractor <br />40 is responsible for devising methods that comply with all ordinances. Compliance with the <br />41 above noise mitigation measures shall not be considered a warranty that the equipment <br />42 or the activity will comply with all local regulations. <br />43 <br />44 Payment <br />45 All costs to comply with the above noise exemption/variance requirements shall be <br />46 included in the associated items of Work. <br />47