Laserfiche WebLink
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 34 March 5, 2026 <br />1 1-08.1(7)A.RTF <br />2 1-08.1(7)A Payment Reporting <br />3 (November 25, 2024 APWA GSP <br />4 Delete this section and replace it with the following: <br />5 <br />6 1-08.1(7)A VACANT <br />7 <br />8 1-08.1(8)B.RTF <br />9 1-08.1(8)BClauses Required in Subcontracts of All Tiers <br />10 (November 25, 2024 APWA GSP) <br />11 Delete item 8 of the second paragraph of Section 1-08.1(8)B. <br />12 <br />13 1-08.1(9).OptionB.RTF <br />14 1-08.1(9) Submittal of Executed Subcontracts <br />15 <br />16 (April 22, 2025 APWA GSP, Option B) <br />17 <br />18 Section 1-08.1(9) content and title are deleted and replaced with the following: <br />19 <br />20 Vacant <br />21 <br />22 1-08.3.GR1 <br />23 Progress Schedule <br />24 <br />25 1-08.3(2).GR1 <br />26 General Requirements <br />27 <br />28 1-08.3(2)A.RTF <br />29 1-08.3(2)A Type A Progress Schedule <br />30 (February 17, 2026 APWA GSP) <br />31 <br />32 Revise this section to read: <br />33 <br />34 The Contractor shall submit ***3*** copies of a Type A Progress Schedule no later than at <br />35 the preconstruction conference, or some other mutually agreed upon submittal time. The <br />36 schedule may be a critical path method (CPM) schedule, bar chart, or other standard <br />37 schedule format. Regardless of which format is used, the schedule shall identify the critical <br />38 path. The Engineer will evaluate the Type A Progress Schedule and accept or return the <br />39 schedule for corrections within 15 calendar days of receiving the submittal. <br />40 <br />41 1-08.4.RTF <br />42 1-08.4 Prosecution of Work <br />43 <br />44 Delete this section and replace it with the following: <br />45 <br />46 1-08.4 Notice to Proceed and Prosecution of Work <br />47 (February 17, 2026 APWA GSP) <br />48 <br />49 Notice to Proceed will be given after the Contract has been executed and the contract <br />50 bond and evidence of insurance have been approved and filed by the Contracting Agency. <br />51 The Contractor shall not commence with the Work until the Notice to Proceed has been