My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lakeside Industries, Inc. 4/29/2026
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lakeside Industries, Inc. 4/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 11:42:49 AM
Creation date
4/29/2026 11:22:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lakeside Industries, Inc.
Approval Date
4/29/2026
Council Approval Date
4/29/2026
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2026 Pavement Maintenance Overlay
Public Works WO Number
WO3860
Tracking Number
0005231
Total Compensation
$2,953,770.90
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2026 Pavement Maintenance Overlay Special Provisions <br />PW# 3860 SP - 53 March 5, 2026 <br />1 5-04.3(3) Equipment <br />2 <br />3 5-04.3(3)A Mixing Plant <br />4 Plants used for the preparation of HMA shall conform to the following requirements: <br />5 <br />6 1.Equipment for Preparation of Asphalt Binder Tanks for the storage of asphalt <br />7 binder shall be equipped to heat and hold the material at the required <br />8 temperatures. The heating shall be accomplished by steam coils, electricity, or <br />9 other approved means so that no flame shall be in contact with the storage tank. <br />10 The circulating system for the asphalt binder shall be designed to ensure proper <br />11 and continuous circulation during the operating period. A valve for the purpose of <br />12 sampling the asphalt binder shall be placed in either the storage tank or in the <br />13 supply line to the mixer. <br />14 <br />15 2.Thermometric Equipment An armored thermometer, capable of detecting <br />16 temperature ranges expected in the HMA mix, shall be fixed in the asphalt binder <br />17 feed line at a location near the charging valve at the mixer unit. The thermometer <br />18 location shall be convenient and safe for access by Inspectors. The plant shall <br />19 also be equipped with an approved dial-scale thermometer, a mercury actuated <br />20 thermometer, an electric pyrometer, or another approved thermometric instrument <br />21 placed at the discharge chute of the drier to automatically register or indicate the <br />22 temperature of the heated aggregates. This device shall be in full view of the plant <br />23 operator. <br />24 <br />25 3.Heating of Asphalt Binder The temperature of the asphalt binder shall not <br />26 exceed the maximum recommended by the asphalt binder manufacturer nor shall <br />27 it be below the minimum temperature required to maintain the asphalt binder in a <br />28 homogeneous state. The asphalt binder shall be heated in a manner that will <br />29 avoid local variations in heating. The heating method shall provide a continuous <br />30 supply of asphalt binder to the mixer at a uniform average temperature with no <br />31 individual variations exceeding 25F. Also, when a WMA additive is included in the <br />32 asphalt binder, the temperature of the asphalt binder shall not exceed the <br />33 maximum recommended by the manufacturer of the WMA additive. <br />34 <br />35 4.Sampling and Testing of Mineral Materials The HMA plant shall be equipped <br />36 with a mechanical sampler for the sampling of the mineral materials. The <br />37 mechanical sampler shall meet the requirements of Section 1-05.6 for the <br />38 crushing and screening operation. The Contractor shall provide for the setup and <br />39 operation of the field-testing facilities of the Contracting Agency as provided for in <br />40 Section 3-01.2(2). <br />41 <br />42 5.Sampling HMA The HMA plant shall provide for sampling HMA by one of the <br />43 following methods: <br />44 <br />45 a. A mechanical sampling device attached to the HMA plant. <br />46 <br />47 b. Platforms or devices to enable sampling from the hauling vehicle without <br />48 entering the hauling vehicle.
The URL can be used to link to this page
Your browser does not support the video tag.