My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 4/27/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 4/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 12:52:27 PM
Creation date
4/29/2026 12:50:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
4/27/2026
Council Approval Date
4/22/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Klayton Leingang
Subject / Project Title
North Broadway Pedestrian Bridge final design plans, specifications, and estimate
Tracking Number
0005233
Total Compensation
$3,059,270.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 <br />kimley-horn.com 2828 Colby Avenue, Suite 200 Everett, WA 98201 425-708-8275 <br />The project is funded in part through MAWA Tier Pedestrian and Bicycle Program funds <br />administered by WSDOT. If the final construction cost of the bridge exceeds the available <br />MAWA funding, the College will be responsible for securing additional funding necessary to <br />advance construction. Funding roles and responsibilities are further defined in the MAWA award <br />documentation and funding agreement. <br />Kimley-Horn’s scope of services includes coordination with the City, College, WSDOT, and <br />stakeholders; survey and base mapping; geotechnical evaluation and recommendations; Type, <br />Size, and Location (TS&L) development at a preliminary design level; State Environmental <br />Policy Act (SEPA) and National Environmental Policy Act (NEPA) coordination and <br />documentation; utility coordination; pedestrian bridge design; stormwater design; pathway and <br />sidewalk connections within the project limits; and preparation of preliminary (~30%), <br />intermediate (~60%), final (~90%), and PS&E (100%) and bid-ready documents. <br />The design phase is anticipated to be completed over an approximately twenty-six (26) month <br />period, beginning in April 2026 and concluding in June 2028, subject to timely decisions, <br />agency coordination, and funding authorization. Phase I – Preliminary Design is scheduled for <br />twelve (12) months. Phase 2 – Final Design is scheduled for fourteen (14) months to complete. <br />Scope Sections: <br />·Phase 1 – Preliminary Design and Analysis <br />1.01 Project Management and Coordination (Phase 1) <br />1.02 Agency Coordination and Public Engagement (Phase 1) <br />1.03 Survey and Base Mapping <br />1.04 Geotechnical Explorations and Recommendations <br />1.05 Environmental Coordination and Permitting (Phase 1) <br />1.06 Cultural Resources <br />1.07 Alternatives Analysis <br />1.08 Preliminary (~30%) Design Deliverable <br />·Phase 2 – Final Design <br />2.01 Project Management and Coordination (Phase 2) <br />2.02 Agency Coordination and Public Engagement (Phase 2) <br />2.03 Utility Coordination <br />2.04 Environmental Coordination and Permitting (Phase 2) <br />2.05 Intermediate (~60%) Design Deliverable <br />2.06 Final (~90%) Design Deliverable <br />2.07 PS&E Design Deliverable <br />2.08 Bid Support <br />2.09 Construction Support <br />Project Team: <br />· Prime Consultant: Kimley-Horn & Associates, Inc. (Kimley-Horn) <br />· Subconsultant: Shannon & Wilson (S&W) <br />· Subconsultant: Ott-Sakai & Associates (Ott-Sakai)
The URL can be used to link to this page
Your browser does not support the video tag.