Laserfiche WebLink
Page 23 <br />kimley-horn.com 2828 Colby Avenue, Suite 200 Everett, WA 98201 425-708-8275 <br />this meeting will be to identify the phasing alternatives and develop a collective agreement on <br />MOT alternatives that will be explored and used to help determine the final design alternative <br />that will be carried through to Phase 2. We will clearly define the following: <br />·Project concerns & constraints <br />·Project priorities & wish list items <br />·Identify up to two (2) MOT scenarios that will be evaluated for the project <br />·Temporary Design Criteria <br />·Priority traffic movements to maintain <br />Stormwater Considerations <br />As part of the Alternatives Analysis, Kimley-Horn will perform a planning-level stormwater <br />review to determine feasibility, constructability, and comparison of bridge alternatives. <br />Stormwater efforts will include: <br />·Review of applicable City stormwater requirements and identification of flow control <br />triggers. <br />·Screening-level evaluation of how stormwater requirements may influence bridge landing <br />locations, site layout, and constructability. <br />·Preparation of a stormwater requirements checklist summarizing anticipated permitting, <br />design criteria, and considerations applicable at this stage of the project. <br />Stormwater evaluation under this task is intended to inform alternatives comparison and early <br />design decision-making and will not include hydraulic modeling, facility sizing, or design of <br />stormwater infrastructure. <br />Public Engagement and Visualization <br />Concept-level graphics and visualizations based on the Visual Quality exercise may be prepared <br />to support evaluation of the alternatives and to facilitate discussion with stakeholders and the <br />public. The Alternatives Analysis is anticipated to support the first public engagement opportunity, <br />allowing for feedback on general bridge form, aesthetics, and user experience prior to selection <br />of a preferred alternative. <br />Stakeholder input obtained under this task may include targeted interviews or small-group <br />discussions with representatives identified by the City, the College, and WSU Everett. <br />Stakeholder input will be used to develop evaluation of alternatives and refinement of visual <br />quality elements and will not expand the number of alternatives evaluated or modify the project <br />purpose or footprint. <br />Public input may be collected through a visual preference survey using concept-level graphics to <br />inform evaluation of alternatives and refinement of visual quality elements. <br />Assumptions: <br />l Up to six (6) stakeholder interviews or small-group discussions may be conducted. <br />l One (1) visual preference survey, for distribution to the boarder public, focused on <br />general bridge form, aesthetics, and user experience. Kimley-Horn will provide a <br />platform (SurveyMonkey), develop survey questions, and build survey in SurveyMonkey.