My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 4/27/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 4/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 12:52:27 PM
Creation date
4/29/2026 12:50:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
4/27/2026
Council Approval Date
4/22/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Klayton Leingang
Subject / Project Title
North Broadway Pedestrian Bridge final design plans, specifications, and estimate
Tracking Number
0005233
Total Compensation
$3,059,270.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 37 <br />kimley-horn.com 2828 Colby Avenue, Suite 200 Everett, WA 98201 425-708-8275 <br />l Construction inspection, site observation, materials testing, and document control will be <br />provided by others under separate contract(s) with the City. <br />l Federal-aid construction documentation, including but not limited to certified payroll <br />review, DBE reporting, Buy America compliance, and construction-related federal <br />reporting, is not included. <br />l Construction support services shall be provided up to an agreed not-to-exceed level of <br />effort, defined as 80 RFIs and 55 submittals, with additional services subject to written <br />City authorization. <br />l Redesign resulting from unforeseen field conditions or changes to the approved plans <br />may require a scope amendment. <br />l Pre-construction meeting will be planned and scheduled by the City and Kimley-Horn’s <br />attendance is for design related discussion. <br />Deliverables <br />l Submittal and shop drawing review comments – Electronic (PDF) <br />l RFI responses related to design and technical clarification – Electronic (PDF) <br />l Engineering support correspondence – Electronic (PDF) <br />Overall Project Assumptions: <br />*Because the Service Provider does not control the cost of labor, materials, equipment or <br />services furnished by others, methods of determining prices, or competitive bidding or market <br />conditions, any opinions rendered as to costs, including but not limited to opinions as to the <br />costs of construction and materials, shall be made on the basis of its experience and represent <br />its judgment as an experienced and qualified professional, familiar with the industry. The <br />Service Provider cannot and does not guarantee that proposals, bids or actual costs will not <br />vary from its opinions of cost provided in project cost estimates. If the Client wishes greater <br />assurance as to the amount of any cost, it shall employ an independent cost estimator. Service <br />Providers’ services required to bring costs within any limitation established by the Client will be <br />paid for as Additional Services. <br />Proposed Fee <br />See attached fee/hour estimate. <br />Closing <br />Thank you, again, for the opportunity to prepare this proposal. Should you have any questions <br />related to the content of this document, please reach out to our Project Manager at <br />molly.toy@kimley-horn.com
The URL can be used to link to this page
Your browser does not support the video tag.