My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn and Associates, Inc. 4/27/2026
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Kimley-Horn and Associates, Inc. 4/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2026 12:52:27 PM
Creation date
4/29/2026 12:50:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Kimley-Horn and Associates, Inc.
Approval Date
4/27/2026
Council Approval Date
4/22/2026
End Date
12/31/2028
Department
Public Works
Department Project Manager
Klayton Leingang
Subject / Project Title
North Broadway Pedestrian Bridge final design plans, specifications, and estimate
Tracking Number
0005233
Total Compensation
$3,059,270.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 36 <br />kimley-horn.com 2828 Colby Avenue, Suite 200 Everett, WA 98201 425-708-8275 <br />·Verifying contractor requirements and bid document consistency in coordination with the <br />City. <br />·Attending the bid opening, either virtually or in person, as requested by the City. <br />Bid support will be limited to clarification of the contract documents and will not include redesign <br />or substantive changes to the project. <br />Assumptions: <br />l Bid support services are limited to the advertisement period. <br />l Preparation of three (3) addenda is included. <br />l Addenda resulting from significant design changes or revisions are not included. <br />l Kimley-Horn’s role is advisory in nature; the City will issue all formal bid documents and <br />addenda. <br />Deliverables: <br />l Responses to bidder questions – Electronic (PDF) <br />l Bid addenda (up to three) – Electronic (PDF) <br />Task 2.09: Construction Support <br />Kimley-Horn will provide construction phase engineering support services in its role as Engineer <br />of Record (EOR) to support implementation of the project in general conformance with the <br />Contract Documents. Construction phase services under this task are intended to provide <br />technical clarification and design-related support during construction and do not include <br />construction inspection or contract administration. <br />Engineering Support Services <br />Construction phase engineering support is anticipated to include: <br />·Attendance of pre-construction meeting for up to three (3) staff. <br />·Review of contractor material and shop drawing submittals for general conformance with <br />the design intent of the Contract Documents. <br />·Responding to engineering and technical Requests for Information (RFIs) related to <br />design intent, details, and interpretation of the plans and specifications. <br />·Providing EOR review and technical input associated with design-related construction <br />issues identified during construction. <br />Kimley-Horn will coordinate with the City and the Construction Management team, as <br />applicable, to support timely resolution of design-related questions. <br />Roles and Responsibilities <br />The City will be responsible for construction inspection, document control, construction <br />management, contract administration, and acceptance of the work, either directly or through a <br />third-party construction management consultant. <br />Kimley-Horn’s role is limited to providing design-related technical guidance in support of <br />construction and does not include direction of the contractor’s means and methods. <br />Assumptions:
The URL can be used to link to this page
Your browser does not support the video tag.