My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Outdoor Event CenterCity of EverettMarch 3, 2026Fee Proposal Calculation R6DLR Group # 73-25119-00CONSTRUCTION COST LIMITATION$47,000,000We understand the baseline to be $60M GMP which estimates a $47M Construction Cost. Once scope/budget are finalized, fee will be revisited and adjusted accordingly. % of CCLFee AmountCommentsConsultantAIA BASIC SERVICESArchitectural / Interiors / Project Management 4.37%$2,055,000 DLR GroupCivil 0.34% $157,600 Basic Service for Civil Engineering KPFFStructural 1.39% $652,500 DLR GroupMEP 0.00% Through Sub-TradeAdministrative 0.05% $23,500 DLR GroupSubtotal - Basic Services 6.15% $2,888,600ADDITIONAL SERVICESProgramming $150,000 PD. Completed in Phase 1A DLR GroupLandscape Architecture $225,545 Walker | MacyAdvanced Civil Design $703,000 For Specific Engineering of this site. KPFFIT/Low Voltage Systems/Security; Acoustics/ AV $204,096 WJHWField Design Consultant $125,000 DA HoganSignage/Wayfinding $79,500 DLR Group XGDLEED Silver Leadership and Documentation $116,950 DLR GroupFundamental Commissioning (Cx) $45,040 DLR GroupEnhanced Commissioning (Cx) $38,780 DLR GroupLife Safety/Fire Protection/Code Consultant $46,180 FSCBuilding Envelope Consultant $25,000 RDHCommunity Input Consultant $21,500 Headwater PeopleFood Service $50,000 Allowance TBDSubtotal - Additional/Contingent Services $1,830,591Subtotal consultant only fee $854,921DLR Group Consultant Markup 8.00% $68,394 DLR GroupSubtotal - Additional/Contingent Services with markup $1,898,985TOTAL FEES$4,787,585DLR Group 1 Everett Outdoor Event CenterProgressive Design-Build Contract for Everett Outdoor Event CenterExhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.