Laserfiche WebLink
Mr. Andy West <br />February 12, 2026 <br />Page 5 <br /> <br /> <br /> <br />• The Temporary Sewer Discharge Authorization Permit will be applied for by Water Tectonics. <br /> <br />EXCLUSIONS <br /> <br />• Demolition documentation for electrical infrastructure, partial/full building demolition, and <br />hazardous materials. <br />• Lift station (pump) design (by Sazan). <br />• Oil/water separator and grease interceptor selection/design (by Sazan). <br />• Horizontal control for the proposed building (by DLR). <br />• Turbidity monitoring plan (by others, if necessary). <br />• Temporary or permanent dewatering design (by others, if necessary). <br />• Cost estimating (by Bayley). <br />• Boundary line adjustment (BLA) and easement documentation (by the surveyor). <br />• Relocation of SnoPUD transmission lines (see assumptions above). <br />• Modifications to the existing 48-inch transmission water line (not anticipated). <br />• Modifications to any BNSF property or agreements (by others). <br /> <br />FEES <br /> <br />We will provide the above civil engineering services for the following lump-sum fees. <br /> <br />Phase 1A Complete <br /> <br />Phase 1B – Design $ 395,000 <br />Phase 2 – CSS and Closeout 111,000 <br /> <br />Total Phase 1B and 2 Fee $ 506,000 <br /> <br />Thank you for this opportunity to serve DLR Group. If you have any questions concerning this <br />proposal, please feel free to call me at (206) 622-5822. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Joss Gramstad, PE <br />Associate <br /> <br />JCG:heh <br /> <br />10042500044 – 10 <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal