My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Mr. Andy West <br />February 12, 2026 <br />Page 5 <br /> <br /> <br /> <br />• The Temporary Sewer Discharge Authorization Permit will be applied for by Water Tectonics. <br /> <br />EXCLUSIONS <br /> <br />• Demolition documentation for electrical infrastructure, partial/full building demolition, and <br />hazardous materials. <br />• Lift station (pump) design (by Sazan). <br />• Oil/water separator and grease interceptor selection/design (by Sazan). <br />• Horizontal control for the proposed building (by DLR). <br />• Turbidity monitoring plan (by others, if necessary). <br />• Temporary or permanent dewatering design (by others, if necessary). <br />• Cost estimating (by Bayley). <br />• Boundary line adjustment (BLA) and easement documentation (by the surveyor). <br />• Relocation of SnoPUD transmission lines (see assumptions above). <br />• Modifications to the existing 48-inch transmission water line (not anticipated). <br />• Modifications to any BNSF property or agreements (by others). <br /> <br />FEES <br /> <br />We will provide the above civil engineering services for the following lump-sum fees. <br /> <br />Phase 1A Complete <br /> <br />Phase 1B – Design $ 395,000 <br />Phase 2 – CSS and Closeout 111,000 <br /> <br />Total Phase 1B and 2 Fee $ 506,000 <br /> <br />Thank you for this opportunity to serve DLR Group. If you have any questions concerning this <br />proposal, please feel free to call me at (206) 622-5822. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Joss Gramstad, PE <br />Associate <br /> <br />JCG:heh <br /> <br />10042500044 – 10 <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.