My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />DLR Group inc. <br />an Arizona corporation <br />6225 North 24th Street, Suite 250 <br />Phoenix, AZ 85016 <br /> <br /> <br />11/10/2025 <br /> <br />Re: Everett Multipurpose Sports Stadium – LEED Commissioning Scope of Work_REVISED <br /> <br /> <br />Thank you for asking DLR Group for a proposal for the following commissioning services associated with the <br />pursuit of LEED v4 BD+C: New Construction for the Everett Sports Stadium. <br />Our Professional Engineers (PE’s), Certified Commissioning Authorities (CxA’s), RESET, WELL & LEED <br />Accredited Professionals, stand ready to provide premier service for your project, to help create smarter, <br />healthier buildings that support both increased energy efficiency and enhanced indoor environmental <br />quality to elevate occupant comfort and well-being and reduce carbon emissions. <br />DLR Group shall provide Commissioning (Cx) services and act as Commissioning Authority (CxA) to provide <br />functional confirmation and quality assurance for the following systems and their associated controls to meet <br />the Owner’s Project Requirements. <br />COMMISSIONING <br />DLR Group’s commissioning process meets and often exceeds the basic requirements of the 2021 Washington <br />State Energy Code (WSEC). <br />DLR Group’s commissioning process shall meet or exceed the following industry codes, standards and <br />guidelines: <br />• ASHRAE Guideline 0-2019 – The Commissioning Process <br />• ASHRAE Guideline 1.1-2007 – HVAC&R Technical Requirements for the Cx Process. <br />• ASHRAE Standard 202-2018 -- Commissioning Process for Buildings and Systems <br />• Building Commissioning Association (BCA): New Construction Building Commissioning Best Practices <br />• ACG Commissioning Guideline for Building Owners, Design Professionals and Commissioning Service <br />Providers, 2nd Edition, AABC Commissioning Group (ACG), 2005. <br />• NEBB; Procedural Standards for Whole Building Systems Technical Commissioning for New <br />Construction, National Environmental Balancing Bureau (NEBB), 2014 <br />• SMACNA HVAC Systems Commissioning Manual. <br /> <br />COMMISSONING SCOPE OF WORK: <br />DLR Group to provide commissioning services for mechanical, electrical, plumbing, and renewable energy <br />systems and assemblies in accordance with ASHRAE Guideline 0-2013 and ASHRAE Guideline 1.1–2007 for <br />HVAC&R Systems, as they relate to energy, water, indoor environmental quality, and durability. <br />The following is a breakdown of anticipated scope for required commissioning activities along with additional <br />scope options pertaining to the U.S. Green Building Council’s LEED BD+C: New Construction v4. <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.