Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 5 <br /> <br /> <br />1. Pricing for additional Commissioning scope for other building systems not specifically required to be <br />commissioned per IECC 2021, including, but not limited to fire pumps, electronic safety and security <br />systems, emergency generators, site utility systems and vertical transportation can be included upon <br />request on a T&M basis at DLR Group’s standard hourly rates. <br />2. DLR Group has no contingency included for retesting equipment that has failed functional testing of <br />equipment. Upon receipt of a completed pre-functional checklist or a system-readiness letter from the <br />contractor, DLR Group shall functionally test the equipment. In the event that retesting is required due <br />to the systems not being ready for testing due to the contractor not being completed, then retesting <br />shall be completed on a ‘work order’ basis. It shall be the contractor’s responsibility to properly prepare <br />systems for testing and if a test fails, the contractor is solely responsible to bear the added cost for <br />retesting. <br /> <br />Sincerely, Accepted by: <br />DLR Group __________ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal