Laserfiche WebLink
Page 4 <br /> <br /> <br />FEE PROPOSAL: <br /> <br />Below is a revised breakdown of the proposed commissioning fee. As noted below, Phase 1A services have <br />been completed. The remaining scope is to cover the remaining design phase and construction phase services. <br />• Phase 1A: Scope that includes design commissioning services up to the Mini GMP deliverable <br />(Completed – November 10, 2025 ). <br />• Phase 1B: Scope that includes design phase commissioning services as noted above for the Mini GMP <br />duration, November 10, 2025 – April 7, 2026. <br />• Phase 2: Scope that includes construction and occupancy phase commissioning services as noted <br />above, April 8, 2026 – July 19, 2027. <br /> <br />LEED BD+C: New Construction - Fundamental & Enhanced Commissioning Cost <br />EA Prerequisite - Fundamental Commissioning – PHASE 1A (COMPLETED) $17,720.00 <br />Option 1 Path 1: Enhanced Commissioning (3 points) – PHASE 1A (COMPLETED) $7,450.00 <br /> <br />EA Prerequisite - Fundamental Commissioning – PHASE 1B $5,464.00 <br />Option 1 Path 1: Enhanced Commissioning (3 points) – PHASE 1B $5,266.00 <br />• Alternate 01 Scope – Additional 1,500 Seats - <br />• Alternate 02 Scope – Premium Club / Party Deck $2,000.00 <br />• Alternate 03 Scope – Full Cooking Kitchen & Commissary $2,000.00 <br />• Alternate 04 Scope – Admin Offices $1,000.00 <br />Total Phase 1B Commissioning Fee $10,730.00 <br />Total Phase 1B Commissioning Fee + Alternates $15,730.00 <br /> <br />EA Prerequisite - Fundamental Commissioning – PHASE 2 $21,856.00 <br />Option 1 Path 1: Enhanced Commissioning (3 points) – PHASE 2 $21,064.00 <br />• Alternate 01 Scope – Additional 1,500 Seats - <br />• Alternate 02 Scope – Premium Club / Party Deck $3,000.00 <br />• Alternate 03 Scope – Full Cooking Kitchen & Commissary $3,000.00 <br />• Alternate 04 Scope – Admin Offices $1,000.00 <br />Total Phase 2 Commissioning Fee $42,920.00 <br />Total Phase 2 Commissioning Fee + Alternates $49,920.00 <br /> <br />TOTALS <br />Total Commissioning Fee $78,820.00 <br />Total Commissioning Fee + Alternates $90,820.00 <br /> <br />TOTAL COMMISSIONING FEE REMAINING $53,650.00 <br />TOTAL COMMISSIONING FEE REMAINING + ALTERNATES $65,650.00 <br /> <br />Notes: <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal