My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Everett Outdoor Event Center – Phase 1B <br />January 6, 2026 <br />Page 2 of 9 <br /> Document tree protection plans for work within our scope. Other disciplines will document <br />the demolition of site features and utilities within their respective scopes of work. <br /> Review and evaluate cost estimates prepared by others for work within our scope. <br /> <br />4. Walker Macy proposes the following sub-consultant to assist us on the project and will be <br />contracted directly to Walker Macy: <br /> Irrigation Consultant: Design Two Four / Two Six <br /> <br />5. The team’s Civil Engineer will be responsible for the following: <br /> Document all subsurface utilities. <br /> Document roadway and vehicular improvements including but not limited to: vehicular <br />concrete and asphalt, curbs and curb ramps, parking and service areas, pavement <br />markings and signage, and any work within the public right-of-way excluding soils, planting, <br />and irrigation. Walker Macy will collaborate with the Civil Engineer on road, parking, and <br />site design. <br /> Document horizontal control (layout) for the building and all vehicular site areas. (Walker <br />Macy will document layout for the north and south entrance plazas, site features, site <br />furnishings, and planting). <br /> Document grading for all site areas after Design Development. (Walker Macy will <br />document grading of the north and south entrance plazas, through Design Development, <br />then transfer to the Civil Engineer). <br /> Document all erosion and sedimentation control. <br /> <br />6. The team’s Structural Engineer will document structural information for all walls greater than <br />4’ in height (measured from bottom of footing to top of wall) and will document reinforcing for light pole <br />foundations. The Structural Engineer will be available to review structural components of Walker Macy <br />details and will provide signed and stamped structural calculations and redlines for details including but <br />not limited to: custom guardrails and handrails, custom bench supports, joist and structural support <br />member spacing and sizing for decks, fencing systems and structural footings, anchors and supports for <br />other elements. <br /> <br />7. The team's Electrical Engineer will document all lighting and electrical services. Walker Macy <br />will work with Client and design team to advise on design intent for site fixtures and will provide layout <br />information for site lighting fixtures in the landscape layout plan. We assume that the Architect will advise <br />on building mounted exterior light fixtures. The Electrical Engineer or lighting designer will provide CAD <br />files of the electrical fixture locations to Walker Macy. The Electrical Engineer or lighting designer will <br />provide required photometric analysis. <br /> <br />8. The team's cost estimating consultant or General Contractor will provide statements of <br />probable costs. We will review and evaluate cost estimates prepared by others for work within our scope. <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.