Laserfiche WebLink
Everett Outdoor Event Center – Phase 1B <br />January 6, 2026 <br />Page 7 of 9 <br /> Community meetings. <br /> Additional design or construction phases. <br /> Additional deliverables including drawing sets and formal presentations. <br /> Professional renderings and graphics. <br /> Green roofs or planting on structure. <br /> Collaboration with artist. <br /> Adaptation of the irrigation design to use irrigation standards and details provided by <br />others. This proposal assumes the use of Irrigation Consultant standards and details. <br /> Project schedule extensions beyond July 2026 for Tasks 1 – 4. <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal