My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 5/1/2026 Amendment 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 5/1/2026 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2026 1:25:53 PM
Creation date
5/4/2026 1:23:36 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
5/1/2026
Council Approval Date
4/29/2026
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1B of the project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004869
Total Compensation
$3,880,006.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Bayley Construction LP 6/18/2025
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />January 9, 2026 <br />Page 5 of 10 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />· Provide design recommendations for partition types, room shapes and finishes where sound <br />isolation and acoustical quality are important. Recommendations will be provided that <br />conform with established background noise criteria (NC level) for occupied spaces as well as <br />recommendations to define standards for STC wall ratings and limiting the transmission of <br />noise from one function to an adjacent function. <br />· Recommendations will be written with detailed drawings in sketch form and manufacturer's cut <br />sheets for use by the design team in developing working drawings. <br />Structured Cabling System (Tel/Data, Wi-Fi, PoS, BMS, etc.) <br />· Coordination and design of the low voltage systems throughout the facility, including the <br />telephone and data cabling, TV, surveillance and access control, point of sale and building <br />management systems throughout the project. <br />· Work with the architectural team to establish room sizes and locations, along with anticipated <br />heat and power loads and determination of the cabling and device location information from <br />each of the low voltage systems. <br />· Determine the appropriate pathways, including redundant paths for critical elements, provide <br />documentation of the conduit, riser, and cable tray requirements. This work includes working <br />with Owner or Architect to determine appropriate riser closets, locations, layout, sleeves, and <br />distribution of cabling within each closet. <br />· Specify an appropriate cabling system to support telephone and data cabling. This cabling <br />system will consist of appropriate station cabling as well as a backbone to support the station <br />cabling. <br />· Design the technical infrastructure of the backbone of this system to consist of fiber, telephone <br />trunk cabling, as well as the appropriate interconnects of patch panels, jack panels and cross <br />connects to the station cabling. <br />· Coordinate the design with the other systems to eliminate duplicate conduit and cable tray <br />systems. Future cable management and maintenance is also improved as the as-built records <br />of cabling are contained in a single document, eliminating the need to refer to several sets of <br />drawings to obtain the complete picture. <br />· Documentation of Wi-Fi AP locations per owner direction. <br />· Documentation of owner-designated and located video coaching/player tracking cabling <br />Surveillance and Access Control Systems <br />We will: <br />· Work with the Owner/Building Operator, and within their published standards, to design and <br />coordinate all infrastructure and pathways required for building surveillance, access control, <br />and intrusion detection. <br />· Coordination of door hardware and mounting locations, including assistance (but not <br />authorship) to the design team on the preparation of the door schedules. <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.