Laserfiche WebLink
Andy West <br />WJ HW Proposal –Everett Mul tipurpose Stadium <br />January 9, 2026 <br />Page 6 of 10 <br />WJHW, Inc. <br />Designers and Planners for Sound, Video, Security, <br />Telecommunication, Broadcast, Theatre & Acoustics <br /> <br />· These systems will be specified in accordance with the Owner and authorities’ life safety and <br />building access practices for all equipment, software, and configuration. <br />· Design system and equipment specifications, one-line diagrams and details as appropriate. <br />· Document the required integration into the Project Design for a fully functional system and <br />program, e.g., coordination of all door hardware, etc. <br />FEES <br />We propose to perform the design efforts described in this proposal for the fixed fees shown below <br />exclusive of reimbursable expenses. This fee indicates a level of professional service which is consistent <br />with our past work on similarly sized facilities. Any consulting and or design activities we are asked to <br />perform which are not listed in this proposal will be considered an additional service and fee. <br /> <br />PHASE 1B SCOPE DD CD Totals Person <br />Days <br />on Site <br />Bowl Sound/AV/TV Systems $13,200 $14,500 $27,700 1 <br />LED Display System $0 $0 $0 0 <br />In-House Video Production $12,200 $13,300 $25,500 1 <br />Broadcast Cabling $2,500 $2,500 $5,000 0 <br />Acoustics/Noise Control $3,000 $4,300 $7,300 0 <br />Structured Cabling System $6,500 $8,000 $14,500 1 <br />Surveillance & Access Control $3,700 $4,800 $8,500 0 <br />TOTALS $41,100 $47,400 $88,500 4 <br /> <br />PHASE 1B ALTERNATES DD CD Totals Person <br />Days <br />on Site <br />ALT 1 - Additional 1,500 seats, concession, toilets (Bldg E) $2,000 $2,000 $4,000 0 <br />ALT 2 – Elevated premium club, party decks, support (Bldg P) $6,000 $7,000 $13,000 0 <br />ALT 3 – Full cooking kitchen and commissary $500 $500 $1,000 0 <br />ALT 4 – AquaSox Admin Office Fit Out $2,500 $2,500 $5,000 0 <br /> <br /> <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal