Laserfiche WebLink
Page 6 <br />Everett Multipurpose Stadium <br />March 6, 2026 <br /> <br /> <br />will be granted. The time extension will be negotiated based on the extent of changes <br />to the revised backgrounds. <br /> <br />ADDITIONAL SERVICES <br /> <br />Services requested beyond those included in this proposal will be considered Additional <br />Services and will be billed at our standard hourly rates at the time the work is performed <br />or will be estimated on a lump sum basis. Säzän Group, Inc. will not proceed with services <br />we consider to be in addition to the contract without first notifying you and obtaining <br />your authorization. <br /> <br />We appreciate this opportunity to provide engineering services. If this proposal meets <br />with your approval, please sign below and return to us. By your signature, you <br />acknowledge that you have read and agree to the terms of this proposal. We will not <br />proceed with the work until this signed Agreement is returned to us. In addition, you <br />represent that you have authority to bind for Johansen Mechanical, Inc. If you have <br />modified this proposal, we will review your modifications. This Agreement shall not be in <br />effect until we sign, accepting your modifications. <br /> <br />If you have any questions, please contact this office. <br /> <br /> <br />Sincerely, <br /> <br />Säzän Group Inc. <br /> <br /> <br /> <br /> <br />Patrick M. Jung, PE <br />Principal <br /> <br /> <br /> <br />Signed by: Johansen Mechanical, Inc. <br /> <br /> <br /> <br /> <br />Brian Pringle: ________________________________ Date: March 6, 2026 <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal