Page 5 <br />Everett Multipurpose Stadium <br />March 6, 2026 <br /> <br /> <br />6. Architectural BIM Revit models will be provided to Säzän Group for our use, with <br />consultant views identified for our use as backgrounds. <br /> <br />B. Model Level of Design <br />The design model is not intended on being used for take-offs, counts, or fabrication. <br />In general, the Revit model will be modeled to Level of Design (LOD) of 300 for <br />Construction Document. <br /> <br />Säzän will not model above LOD 300 as model above this LOD is best completed by <br />the contractor who will be choosing the specific manufacturer and models of <br />equipment, routing preferences, as well as means and methods of fabrication, <br />installation, and construction. <br /> <br />C. Clash Detection <br />As noted above, the routing is diagrammatic in nature so using clash detection on <br />the design model other than checking for general clearances at locations like shafts <br />or other choke points will not be performed past a basic visual check at these areas. If <br />clash detection is desired this shall be performed by the General Contractor / <br />Subcontractors using their construction / fabrication level models and desired <br />routing. <br /> <br />D. BIM360 Modeling <br />If BIM 360 is used for the project, Säzän assumes the following: <br />1. All Säzän BIM Managers will be added to the BIM360 project with administrator <br />rights so Säzän group can properly manage permissions and users on the Säzän <br />team as they are added or removed from the project. <br />2. Only Säzän Group employees will open the Säzän model and make modifications <br />or corrections. <br />3. A Revit model waiver is signed by all 3rd parties given access to the BIM 360 <br />project if Säzän does not already have a contract with the party. <br />4. Säzän Group shall be given at least two weeks’ notice prior to being removed <br />from the project or the project being archived so that Säzän can retrieve all of the <br />electronic files stored on the project. <br /> <br />E. Construction Operations Building Information (COBie) <br />If COBie standards are utilized, Säzän shall specify a range of acceptable makes and <br />models of equipment, acceptable for use on this project. The General Contractor / <br />Subcontractors shall be responsible for providing COBie spreadsheets with final <br />installed equipment manufacturer, and model information. Any COBie documents <br />provided by Säzän shall be “preliminary” and not for final record. <br /> <br />F. Model Updates <br />Säzän Group expects the model will be continuously updated by the Architect at <br />biweekly intervals. Models submitted by the Architect less than two (2) weeks prior to <br />each submittal will be evaluated by Säzän Group to determine whether the model can <br />be accepted and whether the MEP scope of work can be delivered on schedule. Säzän <br />Group will notify the Architect if there are any model revisions that cannot be <br />incorporated into the project schedule. Alternatively, an extension of the delivery date <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal