Laserfiche WebLink
Mr. Jerod Gummer <br />Cochran Electric <br />November 12, 2025 <br />Page 4 <br /> <br /> <br /> <br />24. Work with the utility to obtain potential energy rebates and/or subsidies for energy <br />conservation will be provided by others. <br />25. Design of temporary power for construction is excluded from this proposal. <br />FEE <br />Our compensation for providing the Scope of Work and Construction Administration Services for <br />the electrical design of this project will be a lump sum of One Hundred Sixty-Nine Thousand <br />Dollars ($169,000). This fee will be billed monthly based on a percentage of the project <br />completed. The following is a breakdown of our fee: <br />Design Development: $105,000 <br />Construction Documents: $64,400 <br />Total $169,400 <br />LABOR RATE SCHEDULE: See attached. <br />REIMBURSABLE EXPENSES <br />Reimbursable expenses as defined in Coffman’s General Terms and Conditions will be billed at <br />actual cost-plus ten percent. The anticipated amount for reimbursable expenses is $200 which <br />is in addition to our fee for the Scope of Services noted above. <br /> <br />Progressive Design-Build Contract for Everett Outdoor Event Center <br />Exhibit to Amendment No. 1 - Phase 1B Work and Fee Proposal