My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 10TH ST 2025 Plans 2026-05-05
>
Address Records
>
10TH ST
>
1020
>
Plans
>
1020 10TH ST 2025 Plans 2026-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2026 3:40:47 PM
Creation date
5/5/2026 3:40:21 PM
Metadata
Fields
Template:
Address Document
Street Name
10TH ST
Street Number
1020
Permit
M2505-075
Year
2025
Notes
new exhaust fan w/ ducting & replace existing heat vent
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ABBREVIATIONS GENERAL <br /> ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION DUCTWORK SYMBOLS <br /> AAV AUTOMATIC AIR VENT DAMP DAMPER H HUMIDIFIER P PUMP TDH TOTAL DYNAMIC HEAD (E) EXISTING EQUIPMENT TO REMAIN <br /> ABV ABOVE DB DRY BULB HB HOSE BIBB P-BF PUMP-BOILER FEED TEMP TEMPERATURE <br /> AC AIR CONDITIONING UNIT DC DUST COLLECTOR HC HEATING COIL P-C PUMP-CONDENSER WATER TF TRANSFER FAN R EXISTING EQUIPMENT TO BE REMOVED DOUBLE LINE SINGLE LINE <br /> AD ACCESS DOOR DET DETAIL HD HEAD P-CF PUMP-CHEMICAL FEED TG TRANSFER GRILLE ER EXISTING EQUIPMENT TO BE RELOCATED <br /> /1/,//1'1//17-'1/1/S hT, <br /> AFF ABOVE FINISHED FLOOR DIA DIAMETER HE HEAT EXCHANGER P-CH PUMP-CHILLED WATER TSP TOTAL STATIC PRESSURE RE RELOCATED EXISTING EQUIPMENT EXISTING EQUIPMENT OR DUCTWORK <br /> —— TO BE REMOVED. <br /> AFS AIR FLOW STATION DIAG DIAGRAM HP HEAT PUMP OR HORSE POWER P-CO PUMP-CONDENSATE TT TEMPERATURE TRANSMITTER ROUND <br /> AHU AIR HANDLING UNIT DIFF DIFFERENTIAL HR HOUR P-ER PUMP-ENERGY RECLAIM TU TERMINAL UNIT EXISTING DUCTWORK TO REMAIN <br /> $AL ACOUSTICAL LINING DISCH DISCHARGE HRU HEAT RECOVERY UNIT P-FO PUMP-FUEL OIL TYP TYPICAL OVAL <br /> � NEW DUCTWORK <br /> ALT ALTERNATE DIV DIVISION HT HEIGHT PBD PARALLEL BLADE DAMPER SQUARE FEET 5 5 <br /> ALUM ALUMINUM DN DOWN HTR HEATER PERF PERFORATED UC UNDERCUT MANUAL VOLUME DAMPER(MVD) JTK ENGINEERING <br /> AP ACCESS PANEL DWG DRAWING HV HEATING AND VENTILATION UNIT PH PREHEAT COIL OR PHASE UNOCC UNOCCUPIED JT� <br /> MOTOR OPERATED DAMPER(MOD) <br /> APPROX APPROXIMATE DX DIRECT EXPANSION HWC HOT WATER CIRCULATION PNEU PNEUMATIC UH UNIT HEATER O//`a a HVAC I PLUMBING I ENERGY <br /> AVG AVERAGE HWP HOT WATER PUMP PRESS PRESSURE A'J WWW.JTKENG.COM <br /> EA EACH HWR HEATING WATER RETURN PRV PRESSURE REDUCING VALVE WF WATER FILTER HVAC REFERENCE SYMBOLS ACCESS DOOR AD <br /> BB ELECTRIC BASEBOARD HEATER EAT ENTERING AIR TEMPERATURE HWS HEATING WATER SUPPLY PS PRESSURE SWITCH WB WET BULB AD <br /> B BOILER EC ELECTRICAL CONTRACTOR HX HEAT EXCHANGER PSI POUNDS PER SQUARE INCH WE WATER COLUMN <br /> BDD BACK DRAFT DAMPER EDH ELECTRIC DUCT HEATER HZ HERTZ PSIG POUNDS PER SQUARE INCH GAUGE WG WATER GAUGE EQUIPMENT IDENTITY RADIUS ELBOW(R=1.5) $BEN <br /> BFC BELOW FINISHED CEILING EF EXHAUSTFAN PT PRESSURE TRANSMITTER W/O WITHOUT (SEE EQUIPMENT ABBREVIATION Q.�pF wA3y C'rj <br /> AHU-01 N f <br /> BFP BACKFLOW PREVENTOR EFF EFFICIENCY ID INTERNAL DIAMETER PTAC PACKAGED TERMINAL AIR CONDITIONER WPD WATER PRESSURE DROP LIST AND SCHEDULES) i T <br /> BG BLAST GATE EJ EXPANSION JOINT IN INCHES V1ITO WATER TEMPERATURE DROP VANE.ELBOW z <br /> BHP BREAK HORSEPOWER EL ELEVATION INCL INCLUDING/INCLUDED QTY QUANTITY W/ WITH EQUIPMENTNUMBER <br /> BLDG BUILDING ELEC ELECTRIC INT INTERNAL P� A 48264 O ��7 <br /> BLW BELOW ENT <br /> RING INV INVERT R-# RETURN AIR <br /> V VOLTS INDICATES <br /> BOB BOTTOM OF BEAM EQUIP EQUIPMENT LE DETAIL,PMENT IRH INFARED HEATER RAF RETURN AIR FAN VA VALVE DIAGRAM(APPL ES ONLY WHERE INDICATED NDIOR <br /> r r F��SYONAL <br /> BOD BOTTOM OF DUCT EQUIV EQUIVALENT RAH RADIANT HEATER VAV VARIABLE AIR VOLUME UNIT <br /> X ON DRAWINGS) BRANCH DUCT TAKE-OFF <br /> BOP BOTTOM OF PIPE ERC ENERGY RECLAIM COIL KW KILOWATT RCF RECIRCULATION FAN VB IVACUUM BREAKER X INDICATES DRAWING ON WHICH April 28,2025 <br /> R <br /> BSMT BASEMENT ERV ENERGY RECOVERY UNIT RCP REFLECTED CEILING PLAN VD VOLUME DAMPER DETAILAPPEARS y y RISE OR DROP DIRECTION OF D <br /> BTU BRITISH THERMAL UNIT ESP EXTERNALSTATIC PRESSURE LAT LEAVING AIR TEMPERATURE RD ROOF DRAIN VEL VELOCITY INDICATES TYPICAL DETAIL AIRFLOW <br /> BV BUTTERFLY VALVE ET EXPANSION HE LBS POUNDS REED REQUIRED VTR VENT THRU ROOF DRAWINGS) <br /> ALL CONTRACT <br /> EUH ELECTRIC WATER <br /> TEMPERATURE <br /> LBSF POUNDS PER HOUR RF RETURN TYP DRAWINGS) <br /> FLEXIBLE CONNECTION(FXC) <br /> C CHILLER EWi ENTERING WATER TEMPERATURE LF LINEAR FEET RF RETURN FAN OR RELIEF FAN X INDICATES DRAWING ON WHICH <br /> CAP CAPACITY EXIST EXISTING LRA LOCK ROTOR AMPS RFG REFRIGERATION UNIT DETAILAPPEARS <br /> CBV CIRCUIT BALANCING VALVE EXPAN EXPANSION LVG LEAVING RH RELATIVE HUMIDITY DIFFUSER IC7I <br /> INDICATES SECTION NUMBER -- <br /> CC COOLING COIL EXT EXTERNAL LWT LEAVING WATER TEMPERATURE RHC REHEAT COIL X SIZE SIZE <br /> CD CEILING DIFFUSER RLA RATED LOAD AMPS CFM/BLOW CFM/BLOW <br /> CF CEILING FAN F FILTER MAV MANUALAIRVENT RM ROOM X INDICATESONWHICHDRAWING <br /> SECTION APPEARS <br /> CFH CUBIC FEET PER HOUR FA FREE AREA MAX MAXIMUM RPM REVOLUTIONS PER MINUTE CEILING RETURN/EXHAUST <br /> CFM CUBIC FEET PER MINUTE FC FLEXIBLE CONNECTION MBH THOUSANDS OF BTU PER HOUR RTU ROOF TOP UNIT — REGISTER(R)OR GRILLE(G) <br /> INDICATES REVISION NUMBER <br /> CFU CHEMICAL FEED UNIT FCU FAN COIL UNIT MC MECHANICAL CONTRACTOR RV RELIEF VALVE X & N�, NLL <br /> CHWP CHILLED WATER PUMP FCV FLOW CONTROL VALVE MCA MINIMUM CIRCUIT AMPACITV hU m0 <br /> LOCATION POINT FOR <br /> CHWR CH LLD WATER RETURN FD FLOOR DRAIN VIED MEDIUM S-% SUPPLY DIFFUSER X COORDINATION BETWEEN FLOOR <br /> CHWS CHILLED WATER SUPPLY F/D FIRE DAMPER MFR MANUFACTURER SA SUPPLY AIR PLANS B PIPING DIAGRAMS NUMBER <br /> CI CAST IRON FIN FINISHED MH MANHOLE SCH SCHEDULE (NUMBER) CFM NU <br /> SIZE SUPPLY AIR GRILLE(G)OR SUPPLY MBER <br /> �y <br /> CL CENTERLINE FL FLANGED MIN MINIMUM SCHEM SCHEMATIC N—► CONNECT NEW TO EXISTING CFM <br /> CCJJ CLG CEILING FLA FULL LOAD AMPS MISC MISCELLANEOUS SD SMOKE DAMPER AIR REGISTER(R) SIZE <br /> CMU CONCRETE MANSORY UNIT FLEX FLEXIBLE MXB MIXING BOX SEF SMOKE EXHAUST FAN TERMINATION POINT OF DEMOLITION NUMBER U <br /> CF _ <br /> CO CLEANOUT FUR FLOOR MTD MOUNTED SF SUPPLY FAN SIM RE TURN AND/OR EXHAUSTAIR NUMBER ZE GRILLE(G)OR REGISTER(R) CFM W <br /> COL COLUMN FM FLOW METER MD MOTORIZED DAMPER SP STATIC PRESSURE �► CO NNECTTOMANUFACTURER'S SIZ <br /> COMP COMPRESSOR FOP FUEL OIL PUMP MUA MAKE-UP AIR UNIT SPEC SPECIFICATION PREPPED CONNECTION <br /> CONC CONCRETE FP FIRE PROTECTION SO SQUARE POINT OF BEAM PENETRATION INTERNALLY LINED DUCT ------ <br /> COND CONDENSATE FPM FEET PER MINUTE NEG NEGATIVE SRV SAFETY RELIEF VALVE <br /> CONN CONNECTION FPS FEET PER SECOND NIC NOT IN CONTRACT SS STAINLESS STEEL PREPURCHASED EQUIPMENT 1 <br /> CONT CONTINUATION FRICT FRICTION PITS NOT TO SCALE ST STORAGETANK I� v <br /> CONTR CONTRACTOR F/S/D COMBINATION FIRE SMOKE DAMPER STD STANDARD 1�� KEYED NOTE NUMBER W <br /> CP CONDENSATE PUMP FT FEET CA OUTSIDE AIR STM STEAM MECHANICAL SYMBOLS J (� <br /> CT COOLINGTOWER FTR FINNED TUBE RADIATOR OAT OUTSIDE AIR TEMPERATURE STP SOUND TRAP <br /> CTF COOLING TOWER FILTER FV FACE VELOCITY OBD OPPOSED BLADE DAMPER STRUCT STRUCTURE OR STRUCTURAL W Z <br /> CWR CONDENSER WATER RETURN OD OUTSIDE DIAMETER SUP SUPPLY <br /> CWS CONDENSER WATER SUPPLY GA GAUGE OC ON CENTER SYS SYSTEM MOTORIZED .� AIR DEVICE TO J <br /> CU CONDENSING UNIT GAL GALLONS OCC OCCUPIED DAMPER BE REMOVED <br /> CUH CABINET UNIT HEATER GALV GALVANIZED ORD OVERFLOW ROOF DRAIN ■ <br /> CV AUTOMATIC CONTROL VALVE GC GENERAL CONTRACTOR OV OUTLET VELOCITY BACKDRAFT DAMPER SUPPLY AIR rid <br /> CVB CONSTANTVOLUMEBOX GPH GALLONS PER HOUR J W U� Z RETURN OR EXHAUST AIR J <br /> CWP CONDENSER WATER PUMP GPM GALLONS PER MINUTE UNDERCUT DOOR <br /> GRD GRILLE/REGISTER/DIFFUSER <br /> GRS/LB GRAINS PER POUND OL _ DO OR LOWER(FREE AREA OUTSIDEAIR <br /> T}'I REQUIRED INDICATED IN <br /> NOTE: T SQUARE FEET) <br /> FIRE DAMPER J <br /> ALL ABBREVIATIONS AND SYMBOLS MAY NOT APPEAR ON THE DRAWINGS FOR COIL O SMOKE DETECTOR <br /> THIS PROJECT. LOUVER <br /> TO" THERMOSTAT WITH HUMIDISTAT <br /> TRANSFER <br /> O THERMOSTAT <br /> O HUMIDISTAT REVISIONS <br /> DRAWING INDEX <br /> MO.0 LEGENDS AND ABBREVIATIONS <br /> MO.1 SPECIFICATIONS <br /> Mo.2 SPECIFICATIONS stage. CONSTRUCTION SET <br /> M0.3 SCHEDULES client.JOHANSEN MECHANICAL <br /> M1.0 FIRST FLOOR HVAC PLAN <br /> project. VALLEY ELECTRIC <br /> M1.1 ENLARGED FIRST FLOOR HVAC PLAN LASER ENGRAVER <br /> 102010TH STREET <br /> M1.2 PARTIAL MEZZANINE LEVEL HVAC PLAN EVERETT,WASHINGTON <br /> M3.0 DETAILS <br /> drawn by. NH <br /> original sheet size. 2436 <br /> M3.1 DETAILS <br /> reYIS10R. None <br /> M4.0 CONTROLS date. 2025.04.28 <br /> scale. <br /> LEGENDS AND <br /> ABBREVIATIONS <br /> L City of Everett Permit Services <br /> EVERETT Reviewed for Permit 07/07/2025 A O R O <br />
The URL can be used to link to this page
Your browser does not support the video tag.