SPECIFICATIONS <br /> GENERAL REQUIREMENTS EXISTING BUILDINGS AND CONDITIONS PRODUCT REQUIREMENTS DUCT SYSTEMS <br /> SUBMISSION OF PROPOSAL DIRECTLY OR INDIRECTLY IN CONNECTION WITH THIS WORK PRIOR TO SUBMITTING BID,THE CONTRACTOR SHALL CONDUCT A SITE VISIT TO REVIEW PRODUCT SHALL MEET SPECIFICATIONS AND SCHEDULED BASIS OF DESIGN EQUIPMENT DUCTWORK SHALL BE CONSTRUCTED AND ERECTED IN ACCORDANCE WITH THE IMC AND <br /> SHALL IMPLY THAT THE BIDDER HAS EXAMINED THE CONTRACT DOCUMENTS AND JOB EXISTING CONDITIONS TO DETERMINE IMPACTS ON EXECUTION OF WORK DETAILED IN AND MATERIALS. SMACNA DUCT CONSTRUCTION STANDARDS AND UNLESS NOTED OTHERWISE SHALL BE 2" <br /> SITE UNDER WHICH THEY WILL BE OBLIGATED TO OPERATE SHOULD THEY BE AWARDED THE CONTRACT DOCUMENTS.IN SUBMITTING THEIR BID THE CONTRACTOR PRESSURE CLASS. hT, <br /> THE WORK UNDER THIS CONTRACT.NO EXTRA CHARGE WILL BE ALLOWED FOR FAILURE ACKNOWLEDGES THEY SUFFICIENTLY REVIEWED AND UNDERSTAND THE SCOPE OF ALL PRODUCTS SHALL BE FREE OF DAMAGE.REPAIR TO DAMAGED PRODUCTS <br /> OF ANY BIDDER TO EXAMINE THE SITE PRIOR TO BID.ANY DISCREPANCIES SHALL BE WORK,INCLUDING ALL ITEMS REQUIRED BY GOOD PRACTICE TO PROVIDE COMPLETE (SCRATCHES,DENTS,CORROSION,ETC)SHALL BEAT CONTRACTORS COST.ANY REPAIRS ALL DUCT DIMENSIONS INDICATED ON THE PLANS ARE INSIDE CLEAR DIMENSIONS.SHEET <br /> BROUGHT FORTH PRIOR TO THE SUBMISSION OF BIDS. AND OPERATIONAL SYSTEMS,WHETHER SPECIFIED OR NOT. SHALL BE APPROVED BY ARCHITECT/ENGINEER.IF DAMAGE IS DEEMED BEYOND METAL DIMENSIONS SHALL BE INCREASED TO ACCOMMODATE LINING THICKNESS. <br /> IN SUBMITTING THEIR BID THE CONTRACTOR ACKNOWLEDGES THEY SUFFICIENTLY CONTRACTOR SHALL VERIFY DIMENSIONS AND EXISTING CONDITIONS PRIOR TO ACCEPTABLE REPAIR BY THE ARCHITECT/ENGINEER THE CONTRACTOR SHALL REPLACE <br /> REVIEWED AND UNDERSTAND THE SCOPE OF WORK,INCLUDING ALL ITEMS REQUIRED PROCEEDING WITH ANY WORK.WHERE DISCREPANCIES OCCUR BETWEEN THESE THE PRODUCT AT THEIR COST. GENERAL DUCTWORK SHALL BE GALVANIZED SHEET METAL. <br /> BY GOOD PRACTICE TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS,WHETHER DOCUMENTS AND EXISTING CONDITIONS,THE DISCREPANCY SHALL BE REPORTED TO JTK ENGINEERING <br /> SPECIFIED OR NOT. THE OWNER AND/OR ENGINEER FOR EXPEDITING AND RESOLVE. BASIC MATERIALS AND METHODS(APPLIES TO ALL WORK) DUCTWORK CONVEYING OR IN HIGH MOISTURE AREAS SHALL BE ALUMINUM. HVAC I PLUMBING I ENERGY <br /> DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS.VERIFY ALL FIGURES, ALL SHUT DOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THE W WW.JTKENG.COM <br /> CONDITIONS,AND DIMENSIONS AT THE JOB SITE. OWNER PRIOR TO COMMENCING WITH WORK. DUCTS EXPOSED IN OCCUPIED AREAS SHALL BE PAINTED PER ARCHITECT. <br /> ALL PIPING SHALL BE INSTALLED AS INDICATED ON THE DRAWINGS IN A NEAT <br /> THE CONTRACTORS ARE RESPONSIBLE TO PROVIDE ALL LABOR AND MATERIALS AS NO PIPING,EQUIPMENT,ETC.SHALL BE REMOVED,DISCONNECTED OR SHUT DOWN WORKMANSHIP-LIKE MANNER AND BE SUPPORTED AS REQUIRED BY CODES.PIPING ALL MITERED RECTANGULAR ELBOWS SHALL HAVE TURNING VANES. <br /> REQUIRED WITHIN THE CONTRACT DOCUMENTS,APPLICABLE CODES AND WITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREAS SHALL BE SETUP AND DOWN AND OFFSET AS REQUIRED DI SUIT FIELD CONDITIONS. <br /> MANUFACTURERS REQUIREMENTS FOR A COMPLETE AND OPERATIONAL SYSTEM. TO REMAIN IN OPERATION WILL NOT BE AFFECTED.IF ANY AREAS NOT WITHIN THE DIELECTRIC COUPLINGS/UNIONS SHALL BE USED WHERE DISSIMILAR METALS ARE DUCTS BRANCHES DIRECTLY CONNECTED TO DIFFUSERS SHALL BE SIZED TO MATCH S B ET <br /> JOINED. C <br /> SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN,REMOVAL OR DISCONNECTION, DIFFUSER NECK SIZE UNLESS NOTED OTHERWISE ON PER PLANS. P of W ASy/NcI"f' <br /> THE CONTRACTOR SHALL MAINTAIN THE PROJECT SCHEDULE AS OUTLINED IN THE SUFFICIENT ADVANCE NOTICE MUST BE GIVEN TO THE OWNER INDICATING WHICH WHERE CONDUITS,CABLES,DUCTWORK OR PIPING PASSES THROUGH FIRE RATED o <br /> CONTRACT DOCUMENTS.THIS INCLUDES ORDERING OF EQUIPMENT.ANY LONG LEAD AREAS WILL BE AFFECTED,WHEN THE PROPOSED SHUTDOWN WILL OCCUR,AND FOR FLOOR OR WALL,THE SLEEVES SHALL BE COMPLETELY SEALED WITH A FIRE STOP LOW PRESSURE DUCTWORK: e <br /> ITEMS ARE TO BE IDENTIFIED AND SUBMITTED TO ARCHITECT/ENGINEER FOR EXPEDITED HOW LONG A PERIOD OF TIME. MATERIAL THAT IS UL LISTED AND ACCEPTED BY THE BUILDING DEPARTMENT AND FIRE LONGITUDINAL AND TRANSVERSE JOINTS,SEAMS AND CONNECTIONS OF SUPPLY AND <br /> REVIEW.LEAD TIME ISSUES ARE NOT ACCEPTABLE REASON FOR SUBMISSION OF DEPARTMENT AS BEING SUITABLE FOR THE SERVICE.MATERIAL SHALL BE INSTALLED IN RETURN DUCTWORK OPERATING AT A STATIC PRESSURE LESS THAN OR EQUAL TO 2 P 48264 <br /> ALTERNATE PRODUCTS UNLESS APPROVED BY ARCHITECT/ENGINEER. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, ACCORDANCE WITH THE REQUIREMENTS OF THE MANUFACTURER TO MAINTAIN THE INCHES WATER GAUGE SHALL BE SECURELY FASTENED AND SEALED WITH WELDS, �"4d'�FGISTEt, 1�w <br /> CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ANY DIRT AND DEBRIS <br /> EXCEPT WHERE INDICATED AS BEING RELOCATED. FIRE RATING OF THE PENETRATED WALL OR FLOOR. GASKETS,MASTICS(ADHESIVES),MASTIC-PLUS,EMBEDDED-FABRIC SYSTEMS OR TAPES �sIONAL ECG CAUSED BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT. ALL EXISTING INSULATION FOR DUCTWORK AND PIPING PERTAINING TO AP THIS WORK PER MANUFACTURER'S REQUIREMENTS. <br /> CONTRACTOR SHALL COORDINATE INSTALLATION OF SLEEVES AS APPROPRIATE WITH CONTINUOUSLY WELDED AND LOCKING-TYPE JOINTS AND SEAMS ON DUCTS ARE NOT <br /> SHALL BE PATCHED AND/OR REPLACED A$REQUIRED TO MAINTAIN VAPOR BARRIER. CONSTRUCTION PHASING.ANY COST FOR FAILURE TO COORDINATE DURING THE • REQUIRED TO BE SEALED PER WSEC C403.10.2.1 April 28,2025 <br /> USE OF THE OWNER'S ELEVATORS AND BUILDING CORRIDORS FOR HANDLING OF THE APPROPRIATE CONSTRUCTION PHASE WILL BE COVERED BY THE CONTRACTOR. <br /> OWNER AND REMOVED EQUIPMENT AND MATERIALS SHALL BE AT THE DIRECTION OF CONTRACTOR SHALL INSPECT THE EXISTING DUCTWORK FOR DEFECTS AND REPORT TO <br /> THE OWNER AND SHALL BE COORDINATED WITH HIS OPERATIONS. THE ARCHITECT/ENGINEER AND THE OWNER ANY DEFICIENCIES PRIOR TO PERFORMING PROVIDE ALL DUCT AND PIPE TRANSITIONS AS REQUIRED TO CONNECT TO EQUIPMENT. DUCT WALL PENETRATIONS SHALL BE SEALED WITH SMACNA CLASS A SEAL. <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF OWN PROPERTY ANY WORK.CONTRACTOR SHALL CLEAN ALL EXISTING DUCTWORK,GRILLES, <br /> REGISTERS AND DIFFUSERS PRIOR TO INSTALLING THE NEW WORK. SUPPORTS AND HANGERS: CONTRACTOR SHALL SPRAY PAINT INSIDE OF DUCT BLACK BEHIND ALL GRILLES AND ■YI <br /> ON THE JOB SITE.OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OF REGISTERS. <br /> PROPERTIES AGAINST FIRE,THEFT AND ENVIRONMENTAL CONDITIONS. RESTORATION OF EXISTING SYSTEMS,DEVICES,FINISHES,ETC.DAMAGED OR ALTERED PIPING HANGERS SHALL BE SPACED SO AS TO PREVENT SAG AND PERMIT PROPER <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE JOBSITE PER BY NEW WORK TO ACCEPTABLE CONDITION AS DETERMINED BY THE OWNER, DRAINAGE A HANGER SHALL BE PLACED WITHIN(1)FOOT OF EACH HORIZONTAL <br /> APPLICABLE LAWS AND INDUSTRY PRACTICES. ARCHITECT AND/OR ENGINEER. ELBOW. DUCT INSULATION <br /> WHERE USED,THE TERM"PROVIDE"SHALL MEAN"FURNISH AND INSTALL". ISOLATE AND DRAIN EXISTING PIPING SYSTEM AS REQUIRED TO ACCOMMODATE CLEVIS OR RING HANGERS WITH STEEL HANGER RODS SHALL BE UTILIZED.HANGERS ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE <br /> INSTALLATION OF THE NEW WORK. SHALL BE SIZED TO ACCOMMODATE PIPING INSULATION AND BE PROVIDED WITH 6" DEVELOPED RATING OF 50 OR LESS IN ACCORDANCE WITH ASTM E84 AND NFPA 90A. <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR WORKMEN'S IDENTIFICATION AND BADGING, SHIELDS TO PROTECT PIPING AT ALL HANGER LOCATIONS. INSULATION SHALL BE INSTALLED PER MANUFACTURERS REQUIREMENTS AND INTENDED <br /> SAFETY AND FIRE PROTECTION,CONTRACTOR'S LIABILITY INSURANCE,BARRICADES, SUCCESSFULLY PRESSURE TEST ALL REROUTED PIPING SYSTEMS.TEST SHALL BE PLASTIC SEPARATOR SHALL BE PROVIDED BETWEEN COPPER PIPING AND CLAMPS. SERVICE. <br /> WARNING SIGNS,TRASH REMOVAL,CUTTING AND PATCHING. PERFORMED AT NORMAL SYSTEM OPERATING PRESSURES.REPAIR AND RETEST AS <br /> REQUIRED UNTIL SYSTEMS PROVE TIGHT. DUCT AND PIPING SHALL BE SUPPORTED BY CODEISTANDARD REQUIREMENTS. DUCTING SHALL BE INSULATED PER WSEC REQUIREMENTS.REFER TO INSULATION TABLES <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SHIPPING,RIGGING,HANDLING AND LOCATED IN DRAWING SET FOR ADDITIONAL INFORMATION. <br /> PROTECTION OF MATERIALS. ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER.CARE SHALL USE MATERIALS COMPATIBLE WITH PIPING SYSTEMS AVOIDING ELECTROLYTIC ACTION <br /> BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS AND CONFORM WITH ANSI/ASME B31,NFPA,MSS SP-58,69,89. SUPPLY AND RETURN DUCTS,PLENUMS NOT IDENTIFIED IN THE INSULATION TABLES SHALL <br /> CONTRACTOR SHALL PROVIDE LABOR TO RECEIVE,UNLOAD,STORE,PROTECT AND OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION.ISOLATE WORK AREAS BY BE INSULATED WITH: <br /> TRANSFER TO POINT OF INSTALLATION,OWNER FURNISHED ITEMS. MEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO DEEP DUST AND DIRT WITHIN • MINIMUM OF R-6 INSULATION IN UNCONDITIONED SPACES <br /> THE CONSTRUCTION AREA. PROVIDE ADDITIONAL L ATTACHMENT <br /> LOCATIONS. <br /> AS REQUIRED IN TRANSFER LOAD TO U <br /> CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND ACCESSORIES AS SPECIFIED OR BUILDING STRUCTURAL ATTACHMENT LOCATIONS.FRAMING/MEMBERS SHALL BE OF • MINIMUM OF R-B INSULATION WHEN LOCATED OUTSIDE THE BUILDING IN CLIMATE ZONE <br /> SCHEDULE IN THE CONTRACT DOCUMENTS.CONTRACTOR SHALL COORDINATE WITH EXECUTION AND QUALITY MATERIAL AND SIZE FOR LOAD PER MANUFACTURER. 4 <br /> EQUIPMENT SUPPLIER TO VERIFY MODELS,FEATURES,ACCESSORIES AND CAPACITIES. • MINIMUM OF R-12 INSULATION WHEN LOCATED OUTSIDE THE BUILDING IN CLIMATE �J <br /> CONTRACTOR SHALL INFORM ENGINEER OF ANY DISCREPANCIES PRIOR TO BIDDING. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH THE PROVIDE SEISMIC BRACING FOR PIPING,DUCTWORK AND EQUIPMENT PER APPLICABLE ZONE 5 <br /> MANUFACTURER'S WRITTEN INSTRUCTIONS.THE CONTRACTOR SHALL PROVIDE ALL CODES.BRACING SHALL BE DESIGNED BY MANUFACTURER,MASON INDUSTRIES OR • WHERE LOCATED WITHIN A BUILDING ENVELOPE ASSEMBLY,THE DUCT OR PLENUM <br /> ALL ELECTRICAL EQUIPMENT AND COMPONENTS SHALL BE UL LISTED. HANGERS AND SUPPORTS REQUIRED FOR A COMPLETE INSTALLATION. APPROVED. SHALL BE SEPARATED FROM THE BUILDING EXTERIOR OR UNCONDITIONED SPACE OR <br /> EXEMPT SPACES BY MINIMUM INSULATION MATCHING THE BUILDING ENVELOP. <br /> CODE COMPLIANCE PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FOR CONNECTIONS TO BUILDING STRUCTURE SHALL BE PROVIDED BY CONTRACTOR IN U <br /> DUCTWORK AND PIPING.DO NOT LEAVE PIPING OPEN ENDED. COORDINATION WITH GENERAL CONTRACTOR.VERIFY CONNECTION LOCATIONS AND MANUFACTURERS:ARMACELL,KNAUF,MANVILLE,OWENS-CORNING OR APPROVED. <br /> ALL WORK SHALL CONFORM TO ALL STATE AND LOCAL CODES,RULES AND TYPE AND USE APPROVED CONNECTION METHOD FOR LOCATION I.E.CONCRETE,POST W1,J <br /> REGULATIONS AND ORDINANCES: WHERE CONDUIT,CABLES,DUCTWORK OR PIPING PASSES THROUGH SMOKE/FIRE TENSION SLABS,WOOD OR STEEL. DUCT ACCESSORIES J IDS <br /> RATED FLOORS OR WALLS,THE SLEEVES SHALL BE COMPLETELY SEALED WITH A FIRE v <br /> • ALL APPLICABLE INDUSTRIAL SAFETY AND HEALTH LAWS AND REGULATIONS STOP MATERIAL THAT IS UL LISTED AND ACCEPTED BY THE BUILDING DEPARTMENT AND MANUAL VOLUME DAMPERS: 1 1 <br /> • LOCAL UTILITY CODES/REQUIREMENTS FIRE DEPARTMENT AS BEING SUITABLE FOR THIS SERVICE SUCH AS DOW CORNING EQUIPMENT SHALL BE SUPPORTED FROM ABOVE OR BELOW AT MINIMUM THE FOUR 1�+ <br /> • LOCAL MECHANICAL,PLUMBING,ENERGY,FIRE AND BUILDING CODES CORP.,SILICONE ELASTOMER,DOW CORNING 3-6548 SILICONE RTV FOAM,OR CORNERS OF THE EQUIPMENT. GALVANIZED STEEL,PRE SMACNA EXCEPT PROVIDE BEARING AT ONE END OF DAMPER J <br /> • 2021 INTERNATIONAL BUILDING CODE WITH STATEWIDE AMENDMENTS(IBC) APPROVED EQUAL.THIS MATERIAL SHALL BE INSTALLED IN ACCORDANCE WITH THE <br /> • 2021 INTERNATIONAL EXISTING BUILDING CODE WITH STATEWIDE AMENDMENTS REQUIREMENTS OF THE MANUFACTURER TO MAINTAIN THE RATING OF THE IDENTIFICATION(EQUIPMENT AND PIPING) ROD AND QUADRANT,WITH LEVER AND LOCK SCREW AT THE OPPOSITE END FOR <br /> (IEBC) PENETRATED WALL OR FLOOR. INSULATED DUCTS,QUADRANTS MOUNTED ON COLLAR TO CLEAR INSULATION.LEVERS W 1..` <br /> • 2021 INTERNATIONAL FIRE CODE WITH STATEWIDE AMENDMENTS(IFC) <br /> • 2021 INTERNATIONAL MECHANICAL CODE WITH STATEWIDE AMENDMENTS(IMC) CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SLEEVING,CUTTING,CORING AND PROVIDE IDENTIFICATION OF ALL PIPES,VALVES,AND EQUIPMENT. MUST BE ACCESSIBLE.PROVIDE PINK PLASTIC RIBBON ON LEVERS TO VISUALLY IDENTIFY <br /> DAMPER LOCATIONS. <br /> • 2021 UNIFORM PLUMBING CODE WITH STATEWIDE AMENDMENTS(UPC) PATCHING AS IT RELATES TO HIS WORK. J <br /> 2021 WASHINGTON STATE ENERGY CODE(WSEC) ALL BRANCH DUCTS CONNECTED TO GRILLES/RESISTERS/DIFFUSERS SHALL HAVE VOLUME <br /> IDENTIFICATION DEVICES TO BE USED SHALL INCLUDE THE FOLLOWING: W <br /> • <br /> • 2021 INTERNATIONAL FUEL GAS CODE(IFGC) CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BEAM PENETRATIONS AS IT RELATES TO • PLASTIC OR ADHESIVE PIPE MARKERS DAMPERS. J <br /> V <br /> • APPLIll <br /> CABLE NATIONAL FIRE PROTECTION ASSOCIATION(NFPA)AND AMERICAN HIS WORK.CONTRACTOR SHALL SUBMIT SIZE AND LOCATION TO THE STRUCTURAL •• PER ANSI A13.1 REQUIREMENTS Q <br /> PETROLEUM INSTITUTE(API)INDUSTRY CODES ENGINEER FOR REVIEW AND DETAIL. •• PROVIDE FLOW DIRECTION ARROWS REMOTE VOLUME DAMPERS SHALL BE PROVIDED FOR DAMPERS ABOVE HARD LID CEILINGS <br /> • ICC/ANSI At 17.1-09,ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES,WITH •• PROVIDE WITHIN 30"OF VALVES OR IN ACCESSIBLE LOCATIONS. J <br /> STATEWIDE AMENDMENTS DRAWINGS INDICATED DIAGRAMMATICALLY THE EXTENT,GENERAL CHARACTER AND •, PROVIDE ON EACH SIDE OF PARTITIONS <br /> • UNDERWRITERS'LABORATORIES LOCATION OF THE WORK INCLUDED.OFFSETS AND/OR CHANGES IN ELEVATION OF VALVE TAGS AND EQUIPMENT TAGS <br /> • NATIONAL ELECTRICAL CODE(NFPA 70)WITH STATEWIDE AMENDMENTS PIPING AND DUCTWORK DUE TO STRUCTURAL OR OTHER INTERFERENCES SHALL BE ACCESS DOORS: <br /> PROVIDED WITHOUT EXTRA COST. •• EQUIPMENT TAGS SHALL BE PLASTIC 3"xi"MINIMUM <br /> PERMITS PROVIDE ACCESS DOORS IN DUCTWORK WHEREVER CONTROLS,CONTROL DAMPERS, <br /> SEAL ALL PENETRATIONS THROUGH BUILDING ENVELOPE WEATHER TIGHT WITH LONG COMMON MATERIALS AND ACCESSORIES(APPLIES TO ALL WORK) COILS,SECURITY BARS OR INSTRUMENTS ARE LOCATED.ACCESS DOOR SIZE BE <br /> CONTRACTOR SHALL SECURE AND PAY ALL FEES AND PERMITS PERTAINING TO THE LIFE CAULK/SEALANT RATED FOR THE ENVIRONMENT. APPROPRIATE FOR ITEM BEING ACCESSED.DOOR SHALL BE VENTLOCK WITH PIANO HINGE <br /> CONTRACT. OR CAM LATCHES. <br /> SEAL ALL SLEEVE PENETRATIONS THROUGH FLOORS WITHIN BUILDING WATER TIGHT. MOTOR STARTERS: REVISIONS <br /> SUBSTITUTIONS ACCESS DOORS ON SUPPLY DUCTWORK SHALL BE DOUBLE WALLED AND PROVIDED WITH <br /> UNLESS NOTED OTHERWISE ALL EQUIPMENT,DUCTWORK,CONDUIT,PIPING AND CONTRACTOR SHALL FURNISH A COMBINATION MOTOR STARTER SIZED IN ACCORDANCE MINIMUM 1 INCH INSULATION. <br /> CONTRACT SHALL SUBMIT PRODUCT SUBSTITUTIONS DURING THE BID PERIOD FOR ASSOCIATED ACCESSORIES ARE TO BE CONCEALED ABOVE CEILINGS AND IN WALLS. WITH THE MOTOR RATING OF THE MECHANICAL EQUIPMENT.START SHALL BE SUPPLIED <br /> PRIOR APPROVAL BY THE ARCHITECT/ENGINEER.CONTRACTOR SHALL BE RESPONSIBLE WITH FUSES OR CIRCUIT BREAKERS,CONTROL TRANSFORMER,OVERLOADS,ONE EQUIPMENT ACCESS DOORS FOR ALL EQUIPMENT LOCATED ABOVE HARD LID CEILINGS. <br /> FOR THE SUBSTITUTE BEING EQUAL TO THE BASIS OF DESIGN PRODUCT.ANY COSTS EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS REQUIREMENTS INCLUDING NORMALLY OPEN AND ONE NORMALLY CLOSED AUXILIARY CONTACT AND H.O.A.SWITCH ACCESS DOOR SHALL BE MINIMUM 24"x24". <br /> FOR THE SUBSTITUTION SHALL BE COVERED BY THE CONTRACTOR. PIPING AND WIRING. MOUNTED IN THE COVER.STARTER ENCLOSURE SHALL BE NEMA RATED FOR ITS <br /> LOCATION.STARTER SHALL BE INSTALLED AND WIRED BY THE ELECTRICAL <br /> PROJECT COORDINATION CONTRACTOR SHALL PROVIDE ALL INTERCONNECTING WIRING AND ACCESSORIES CONTRACTOR. ACCESS DOOR SIZES AND LOCATIONS TO BE COORDINATED WITH ARCHITECT/ENGINEER <br /> BETWEEN EQUIPMENT AND ACCESSORIES PER THE RESPONSIBILITY MATRIX IN THESE FOR FINAL APPROVAL. <br /> THE CONTRACTOR SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES PRIOR DOCUMENTS.ALL WORK SHALL CONFORM TO THE LOCAL ELECTRICAL CODE AND VIBRATION ISOLATION: <br /> TO FABRICATION,PURCHASE AND/OR INSTALLATION OF ALL WORK. REQUIREMENTS WITHIN THE ELECTRICAL CONTRACT DOCUMENTS. FLEXIBLE DUCTWORK: <br /> CONTRACTOR SHALL COORDINATE INSTALLATION OF EQUIPMENT AND SYSTEMS WITH CONTRACTOR SHALL PROVIDE TESTING AND STARTUP OF ALL EQUIPMENT AND DEVICES VIBRATION ISOLATION SHALL BE PER LATEST SMACNA GUIDELINES. <br /> OTHER TRADES INCLUDING INTERFERENCES WITH STRUCTURE,LIGHTING,ETC AS WELL AS WELL AS COORDINATE WITH COMMISSIONING AGENT AND BALANCER FOR SHALL BE OF TWO ELEMENT SPIRAL CONSTRUCTION COMPOSED OF A CORROSION stage. CONSTRUCTION SET <br /> AS REQUIRED MAINTENANCE CLEARANCES. COMPLETE OPERATION SYSTEM. VIBRATION ISOLATION FOR HANGING EQUIPMENT SHALL BE EQUAL TO MASON RESISTANT METAL SUPPORTING SPIRAL AND COATED FABRIC WITH L MINERAL BASE <br /> INDUSTRIES MODEL 30N,COMBINATION SPRING AND DOUBLE DEFLECTION NEOPRENE SHALL AVER OR APPROVED).FLEXIBLE DUCT CONNECTORS SHALL BE UL LISTED AND <br /> CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL DIMENSIONS IN THE FIELD,AND COORDINATE EQUIPMENT,DIFFUSER,REGISTER,DAMPER,ACCESS DOORS,ETC WITH HANGER OR AS RECOMMENDED BY MANUFACTURER FOR APPLICATION. SHALL HAVE A FLAME SPREAD NOT EXCEEDING 25 AND A SMOKE SPREAD NOT EXCEEDING client.JOHANSEN MECHANICAL <br /> SHALL ADVISE THE ARCHITECT/ENGINEER AND THE OWNER OF ANY DISCREPANCIES ARCHITECTURAL CEILING PLANS AND ELEVATIONS AS WELL AS LIGHTING LAYOUT. <br /> 50.SHALL BE CLASS 1 RATED PER UL 181. <br /> BEFORE PERFORMING THE WORK. VERIFY DIFFUSER/REGISTER FRAMES WITH CEILING PRIOR TO ORDERING. VIBRATION ISOLATION FOR BASED MOUNTED EQUIPMENT SHALL BE EQUAL TO MASON <br /> INDUSTRIES SLF OR AS RECOMMENDED BY MANUFACTURER FOR APPLICATION. USE OF FLEXIBLE DUCTWORK SHALL BE LIMITED TO NO MORE THAN 6 LINEAR FEET PER project. VALLEY ELECTRIC <br /> CONTRACTOR SHALL PROVIDE EQUIPMENT AND MATERIAL SUBMITTALS FOR ALL THESE SPECIFICATIONS ARE INTENDED TO COVER THOSE ITEMS TYPICALLY ADDRESSED RUN. <br /> PRODUCTS TO BE USED ON THE PROJECT FOR ARCHITECT/ENGINEER APPROVAL. IN DIVISION 22 AND 23.REFER TO COMPLETE CONTRACT DOCUMENTS FOR ALL LASER ENGRAVER <br /> REQUIREMENTS,INCLUDING THOSE PROVIDED BY OWNER AND OTHER DISCIPLINES. CONTRACTOR SHALL TAKE CARE AS NOT TO ALLOW FLEXIBLE DUCT TO KINK OR COLLAPSE. 102010TH STREET <br /> CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AS INDICATED. WHERE MATERIALS OR EQUIPMENT ARE NOT COVERED IN THESE SPECIFICATIONS EVERETT,WASHINGTON <br /> CONTRACTOR SHALL PROVIDE THE MATERIALS OR EQUIPMENT AS WOULD BE MAXIMUM 2 ELBOWS. <br /> CONTRACTOR SHALL COORDINATE ELECTRICAL CLEARANCE REQUIREMENTS WITH REASONABLY EXPECTED FOR COMPLETE AND OPERATIONAL SYSTEMS UTILIZED BY THE drawn by. N H <br /> OTHER TRADES PER NEC. INDUSTRY FOR SIMILAR PROJECTS IN THE SAME GEOGRAPHIC AREA. FLEXIBLE EQUIPMENT CONNECTIONS: <br /> CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR FOR LOCATION AND PROJECT CLOSEOUT HVAC EQUIPMENT FLEXIBLE DUCT CONNECTIONS SHALL BE A MINIMUM OF 6 INCHES LONG original sheet size. 2436 <br /> WIRING OF HVAC EQUIPMENT. AND HELD IN PLACE WITH HEAVY METAL BANDS,SECURELY ATTACHED TO PREVENT ANY <br /> UPON COMPLETION OF CONSTRUCTION CONTRACTOR SHALL SUPPLY THE OWNER WITH LEAKAGE AT THE CONNECTION POINTS.FLEXIBLE CONNECTS SHALL BE FABRICATED FROM revision. None <br /> CONTRACTOR SHALL COORDINATE INSTALLATION OF ROOF FLASHING PERTAINING TO AS-BUILT DOCUMENTS AND COMPLETE COPIES OF OPERATIONS AND MAINTENANCE APPROVED FLAME PROOF FABRIC PER NFPA 90A(DURO DYNE OR APPROVED).ASBESTOS <br /> THEIR WORK. MANUALS. p CLOTH I NOT A EPTABLE. date. ZO25.O4. 02 <br /> UNLESS NOTED OTHERWISE PROVIDE ONE YEAR GUARANTEE AGAINST DEFECTIVE NOT REQUIRED FOR EQUIPMENT WITH INTERNAL VIBRATION ISOLATION. SC81¢. <br /> MATERIALS AND WORKMANSHIP AFTER FINAL ACCEPTANCE BY OWNER. <br /> DUCT PRESSURE CLASSIFICATIONS ON THIS PROJECT <br /> PROVIDE TRAINING TO OWNERS STAFF TO INCLUDED AT MINIMUM SPECIFICATIONS <br /> • OPERATIONS AND MAINTENANCE MANUAL REVIEW <br /> IDENTIFICATION OF SYSTEM SHUTOFFS AND ISOLATION DUCTS ON THIS PROJECT ARE LIMITED TO LOW PRESSURE CLASSIFICATION. <br /> • <br /> • EQUIPMENT OPERATION INCLUDING <br /> •• ROUTINE MAINTENANCE <br /> •• OPERATING MODES <br /> •• SHUTDOWN AND STARTUP <br /> PROVIDE ALL AHJ INSPECTION REPORTS,STARTUP REPORT,COMMISSIONING REPORT, <br /> BALANCING REPORT,TRAINING COMPLETION REPORT,COMPLETED PUNCH LISTS AND <br /> OTHER DOCUMENTS FOR ARCHITECT/ENGINEERING REVIEW FOR PROJECT CLOSEOUT <br /> VERIFICATION. <br /> FINAL APPROVAL OF PROJECT COMPLETION WILL BE BY OWNER. ` City of Everett Permit <br /> Permit/0 1202 5 O. <br /> EVERETT Reviewed for Permit Service <br />