CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ #2025-062 Thornton A. Sullivan Park Float Renovation <br />Description of Change: (Attach contractor’s change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 11405 Silver Lake Road, Everett, WA 98208 <br />This change order increases the project price to install a permanent concrete anchor and replace threaded <br />rods on Dock #1. This change order will not extend the contract time. <br />Per Section 2.6 of the SWR, the contractor was required to perform a diving check to ensure that connections <br />to submerged concrete anchors were secure. During the diving check, the contractor was unable to locate the <br />concrete anchor for Dock #1. The anchor is required to hold the dock in place and keep it aligned with the <br />access ramp. Without the anchor, the dock cannot be used and is a safety concern for the public. <br />The dock specifications called for ¾” threaded rods. However, during the dock renovation, the contractor <br />discovered that the holes were for 5/8” threaded rods, and most of the existing rods needed replacement <br />because they were bent or broken. This required the contractor to procure new threaded rods to <br />accommodate this change. Without proper threaded rods, the dock's structural integrity and secure assembly <br />are at risk. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change $147,046.20 Contract Time & Completion Date Prior <br />to This Change <br />Completion <br />Date Prior <br />5/15/26 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change++$14,924.42 Net (Increase) or (Decrease) Resulting <br />from this Change 0 <br />* Total Project Price Including this Change $161,970.62 Contract Time & Completion Date <br />Including This Change <br />Completion <br />Date After <br />5/15/26 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent <br />described in the above “Description of Change” and that the compensation shown above represents complete <br />compensation for all such changes, including all direct and indirect costs and impacts. The City of Everett and the <br />Contractor further agree that Contract time shall be adjusted to the extent shown above. This Change Order only <br />changes the contract between City of Everett and the Contractor to the extent explicitly provided in this Change Order. <br />Signatures on this change order may be ink, scanned pdf signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />East Slope Earthworks LLC <br />PO Box 1311 <br />Cle Elum, WA 98922 <br />City of Everett <br />2930 Wetmore Avenue <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department Director: <br />Name & Title:Dustin Slimp, Owner City Attorney Template Approved as to Form 7.14.23 <br />Date:Mayor: <br />*WA Use Tax on materials included. WAC 458-20-171 <br />Attest: ___________________________ <br />Office of the City Clerk <br />0001 <br />5/5/26 <br />5/6/26 <br />5/6/26 <br />05/07/2026 05/08/2026