My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
East Slope Earthworks LLC 5/8/2026 Change Order 1
>
Contracts
>
6 Years Then Destroy
>
2026
>
East Slope Earthworks LLC 5/8/2026 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2026 9:22:42 AM
Creation date
5/8/2026 9:22:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
East Slope Earthworks LLC
Approval Date
5/8/2026
End Date
5/15/2026
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Thornton A. Sullivan Park Float Renovation
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0005182
Total Compensation
$161,970.62
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
East Slope Earthworks LLC 4/2/2026
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025-062 Thornton A. Sullivan Park Float <br />Renovation Change Order 1_050626_SD <br />Final Audit Report 2026-05-08 <br />Created:2026-05-07 <br />By:Marista Jorve (mjorve@everettwa.gov) <br />Status:Signed <br />Transaction ID:CBJCHBCAABAAphHlN4UA5veFH1TFTcuRgnhirxe_2qNJ <br />"2025-062 Thornton A. Sullivan Park Float Renovation Change <br />Order 1_050626_SD" History <br />Document created by Marista Jorve (mjorve@everettwa.gov) <br />2026-05-07 - 6:27:53 PM GMT <br />Document emailed to Jenny Chang (JCHANG@EVERETTWA.GOV) for approval <br />2026-05-07 - 6:28:58 PM GMT <br />Email viewed by Jenny Chang (JCHANG@EVERETTWA.GOV) <br />2026-05-07 - 6:49:48 PM GMT <br />Document approved by Jenny Chang (JCHANG@EVERETTWA.GOV) <br />Approval Date: 2026-05-07 - 6:50:46 PM GMT - Time Source: server <br />Document emailed to dustin slimp (dustins@eastslopeearthworks.com) for signature <br />2026-05-07 - 6:50:51 PM GMT <br />Email viewed by dustin slimp (dustins@eastslopeearthworks.com) <br />2026-05-07 - 7:02:51 PM GMT <br />Document e-signed by dustin slimp (dustins@eastslopeearthworks.com) <br />Signature Date: 2026-05-07 - 7:48:24 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE <br />Document emailed to Tim Benedict (TBenedict@everettwa.gov) for approval <br />2026-05-07 - 7:48:28 PM GMT <br />Email viewed by Tim Benedict (TBenedict@everettwa.gov) <br />2026-05-07 - 7:55:32 PM GMT <br />Document approved by Tim Benedict (TBenedict@everettwa.gov) <br />Approval Date: 2026-05-07 - 7:57:17 PM GMT - Time Source: server
The URL can be used to link to this page
Your browser does not support the video tag.