My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 19 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br />00 7200 - 19 GENERAL CONDITIONS <br />in the Contract Sum or an extension of Contract Time, or both, directly attributable to any suspension in <br />accordance with the Change Order procedures herein; provided, (1) the Contractor shall not be entitled to <br />any increase to the extent caused by the Contractor and (2) Contract Sum increases and Contract Time <br />extensions for suspension caused by Third Parties or Force Majeure Events are limited as set forth in <br />12.4.3.4 Third Party Caused Delays and Force Majeure. <br />5.4. TERMINATION PROCEDURES <br />5.4.1. Termination by Owner for Default <br />The Owner may terminate the Contract upon written notice to Contractor and its surety whenever the <br />Contractor is deemed to be in default or fails to fulfill, in a timely and proper manner, one or more <br />Contract obligations, or is in violation of any provisions or covenants of the Contract. Termination shall <br />be effective upon receipt of such notice by the Contractor. <br />For purposes of this paragraph, the Contractor shall be deemed to be in default upon the occurrence of <br />any one or more of the following events: <br />1. If Contractor is bankrupt or insolvent. <br />2.If Contractor makes a general assignment for the benefit of creditors. <br />3. If a trustee or receiver is appointed for Contractor, or for any of Contractor's property. <br />4. If Contractor files a petition to take advantage of any debtor's law, or to reorganize under any <br />bankruptcy chapter or law. <br />5. If Contractor repeatedly fails to make prompt payments to Subcontractors or others for labor, <br />materials, or Equipment. <br />6. If Contractor disregards laws, ordinances, rules, regulations, or orders of any public body having <br />jurisdiction. <br />7. If Contractor disregards the authority of the Owner or Owner’s Representative. <br />8. If Contractor violates in a substantial way the provisions of the Contract Documents or fails, <br />neglects, or refuses to proceed in compliance with the provisions of the Contract Documents. <br />9.If the Contractor made material misrepresentations to the Owner with respect to: (a) its <br />qualifications or those of its Subcontractors; (b) its or its subcontractors’ ability to perform the <br />Work in a timely, workmanlike manner; (c) the materials installed or to be installed; or (d) <br />progress pay estimates. <br />10.If Contractor fails to supply sufficient skilled workers or suitable materials or equipment. <br />11.If Contractor refuses or fails to prosecute the Work with such diligence as will ensure its Physical <br />Completion within the original Physical Completion time and any extensions of time which may <br />have been granted to the Contractor by change order or otherwise. <br />12. If Contractor performs Work which deviates from the Contract. <br />13. If Contractor otherwise violates in any material way any provisions or requirements of the <br />Contract. <br />After termination of the Contractor for default, the Owner may transfer performance of the Work to the <br />Contractor's surety. The Owner may exclude the Contractor from the Site and take possession of the <br />Work and all of the Contractor's tools, appliances, owned or rented construction equipment, and <br />machinery at the Site and use the same to the full extent they could be used by the Contractor. The <br />Owner may incorporate in the Work all materials and Equipment stored at the Site or for which the <br />Owner has paid the Contractor, but which are not yet on Site. In such case, the Contractor will not be
The URL can be used to link to this page
Your browser does not support the video tag.