My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 47 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br /> <br /> <br /> <br />00 7200 - 47 GENERAL CONDITIONS <br />Work. Therefore, no compensation in addition to that provided in 9.6. FORCE ACCOUNT shall be <br />paid for such things as extended Overhead or other costs or damages. <br />12.4.2.2 Extension of Contract Time <br />Extensions of Contract Time caused by Extra Work shall be determined as provided in 5.2.2.2 <br />Extensions of Contract Time. <br />12.4.3 Delays <br />12.4.3. Owner Caused Delay Unrelated to Extra Work <br />12.4.3.1.1 Adjustment of Contract Sum <br />If the Contractor is entitled to an adjustment of Contract Sum because of a Delay solely caused by the <br />Owner that does not relate to Extra Work, Contractor shall only be compensated for the items below, <br />less all funds paid pursuant to any change in the Contract Sum that contributed to the Delay: <br />1. Documented, incurred cost of nonproductive field supervision or labor extended because of the <br />Delay; <br />2. Documented, incurred cost of home office supervision to attend jobsite meetings; <br />3. Documented, incurred cost of temporary facilities or equipment rental extended because of the <br />Delay; <br />4. Documented, incurred cost of insurance extended because of the Delay; <br />5. General and administrative Overhead in an amount to be agreed upon, but not to exceed three <br />percent (3%) of original Contract Sum divided by the Contract Time for each day of the Delay. <br />Owner shall not owe Contractor compensation for extended Overhead or other delay costs to the <br />extent Contractor or anyone other than the City contributed to or is concurrently responsible for the <br />Delay. <br />12.4.3.1.2 Adjustment of Contract Time <br />If the Contractor is entitled to an adjustment of Contract Time because of a Delay solely caused by <br />the Owner that does not relate to Extra Work, Contractor shall be entitled to an adjustment of <br />Contract Time to the extent the Delay increases the duration of the Project, as measured by the critical <br />path and as demonstrated pursuant to the requirements of 5.2.2.2 Extensions of Contract Time. <br />12.4.3.2 Contractor Caused Delay <br />If the Contractor is solely responsible for any Delay to any interim milestone, Substantial Completion, <br />Physical Completion or the Completion Date, the Owner shall be entitled to liquidated or other damages <br />as provided elsewhere in the Contract Documents. The Contractor accepts the risk of any Delays caused <br />by strikes, work slowdowns, job actions and labor unrest of any kind. Contractor shall not be entitled to <br />any increase in Contract Sum or Contract Time due to a Delay it caused. <br />12.4.3.3 Delays Concurrently Caused by Contractor and Owner <br />If the Owner and the Contractor cause a Delay concurrently, neither the Owner nor the Contractor shall be <br />liable to the other except as provided herein. <br />12.4.3.3.1 Adjustment of Contract Sum <br />The Contractor shall not be entitled to any adjustment in Contract Sum for Delays concurrently <br />caused by the Owner and the Contractor. <br />12.4.3.3.2 Adjustment of Contract Time <br />The Contractor shall be entitled to an extension of Contract Time for the Owner caused portion of any <br />Delay concurrently caused by the Owner and Contractor to the extent the Owner caused the Delay to <br />extend longer than if the Contractor had solely caused the Delay.
The URL can be used to link to this page
Your browser does not support the video tag.