My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 7200 - 48 <br />2026 WPCF Biosolids Removal & Disposal UT 3752-30 <br />00 7200 - 48 GENERAL CONDITIONS <br />12.4.3.4 Third Party Caused Delays and Force Majeure <br />For the purposes of this section 12.4.3.4, a “Force Majeure Event” is defined as earthquake, flood, <br />pandemic (and governmental laws, regulations, requirements, and orders resulting therefrom), natural <br />disasters, acts of war or acts of terrorism. <br />For the purposes of this section 12.4.3.4, a “Third Party” is defined as a third party for whom neither <br />the Contractor nor the City is responsible. <br />12.4.3.4.1 Adjustment of Contract Sum <br />The Owner and the Contractor shall not be responsible to compensate each other financially for <br />any Delay to the extent caused by a Third Party or a Force Majeure Event. A Delay caused by a <br />utility’s failure to provide service or relocate its lines (despite a timely request for such service or <br />relocation) is an example of this kind of Delay for which neither the Contractor nor the Owner is <br />financially responsible to the other. Mislocated utility lines or utility lines not located are another <br />example of a Delay for which neither the Contractor nor the Owner is responsible to the other. <br />However, the Contractor’s failure to request a utility locate or relocation in a timely way is not, <br />and any resulting Delay would be the responsibility of the Contractor. Because the Contractor is <br />responsible for ordering materials and Equipment, Contractor shall not be entitled to an <br />adjustment of Contract Time or Contract Sum due to Delays caused by the lack of materials or <br />Equipment. A strike, job action, slowdown, work to rule, or other job action or labor dispute or <br />problem is not a Delay caused by a Third Party for the purposes of section 12.4.3 Delays. <br />12.4.3.4. 2 Adjustment of Contract Time <br />The Contractor shall be entitled to an extension of Contract Time for Delays to the extent caused <br />by a Third Party or Force Majeure Event. Extension of Contract Time shall be determined <br />pursuant to 5.2.2.2 Extensions of Contract Time. <br />12.4.3.5 Extended or Unabsorbed Overhead <br />12.4.3.5.1 General <br />To present a request for additional compensation for Extended or Unabsorbed Overhead, the <br />Contractor has the burden of keeping and maintaining accurate documentation to support any such <br />claim. If the Contractor fails to provide or keep adequate financial data for an accurate and fair <br />Eichleay calculation, Contractor waives and releases any claim for Unabsorbed or Extended <br />Overhead. In presenting any claim under this section of the Contract, the Contractor agrees to provide <br />to the Owner any and all financial data needed by the Owner, or its representative, to review, <br />substantiate and evaluate any claim for Extended and/or Unabsorbed Home Office Overhead. Failure <br />to provide the requested information shall constitute waiver by the Contractor. <br />If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or Extended Overhead, it <br />shall be calculated as provided in 9.5.3. Unabsorbed and Extended Overhead. <br />12.4.3.5.2 Elements <br />Contractor shall only be entitled to an adjustment of Contract Sum for Unabsorbed or Extended <br />Overhead if it clearly and convincingly demonstrates all of the following: <br />1.The Owner solely caused a delay to the Completion Date as measured by analysis of the project <br />duration by the critical path method pursuant to 5.2.2.2 Extensions of Contract Time; <br />2.Because of such Delay, the Contractor was forced to suspend or significantly interrupt its <br />performance so that it was on standby or idled, and the Owner required the Contractor to be ready <br />to resume performance on short notice. Extended time of performance of Work, such as <br />extensions caused by changes, inefficiencies, or Extra Work, does not constitute suspension or <br />significant interruption of performance.
The URL can be used to link to this page
Your browser does not support the video tag.