My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group, LLC 5/20/2026
>
Contracts
>
Agreement
>
Other Services Agreements
>
American Process Group, LLC 5/20/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 11:56:08 AM
Creation date
5/20/2026 11:49:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group, LLC
Approval Date
5/20/2026
Council Approval Date
4/15/2026
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
2026 Biosolids Dredging and Disposal
Tracking Number
0005247
Total Compensation
$4,539,124.60
Contract Type
Agreement
Contract Subtype
Other Services Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 01 1100 - 8 <br />2026 Biosolids Removal and Disposal UT 3752-30 <br />01 1100 - 8 SUMMARY OF WORK <br />1.14 CITY OF EVERETT BUSSINESS LICENSE <br />A.Contractor must obtain a City of Everett business license prior to performing any <br />Work pursuant to this Contract. <br />1.15 PERMITS <br />A.The Contractor shall be responsible to obtain and pay the cost of any applicable <br />permits and connection fees required to do the Work, and such costs shall be <br />included in the Bid. <br />1.16 CODES AND STANDARD SPECIFICATIONS <br />A.All construction shall be in accordance with the International Building Code, <br />Current Adopted Edition. <br />B.All construction shall be in accordance with the Uniform Mechanical Code, and <br />the Uniform Plumbing Code, latest editions. <br />C.All construction shall be in conformance with the WSDOT/APWA Standard <br />Specifications and Standard Plans, latest edition. <br />D.All construction shall be in conformance with the City of Everett Design and <br />Construction Standards and Specifications, latest edition. <br />E.All work shall comply with applicable requirements of Snohomish County. <br />F.Any material specified by reference to the number, symbol, or title of a specified <br />standards, such as Commercial Standard Federal Specifications, a trade <br />association standard, or other similar standard, shall comply with the <br />requirements of the latest revision thereof, and any amendment or supplement <br />thereto in effect on the date of Invitation for Bids, except as limited to type, class <br />or grade, or modified in such references. All work shall conform to the standard <br />referred to, except as modified in these specifications and the drawings.
The URL can be used to link to this page
Your browser does not support the video tag.